(Latest | Earliest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)- 15:14, 14 December 2012 Group 3 - Homelite Fluid Pump (Gasoline Powered) - Project Planning (hist) [16,743 bytes] MAE 277 2012 - Group 3 (Talk | contribs) (Created page with "<!-- Link back to Group 3 Home Page ; appears above the TOC --> Group 3 Home Page ==Work Proposal== <!-- MAIN IDEA (INT...")
- 14:55, 14 December 2012 Group 2 Gate 5 (hist) [4,241 bytes] MAE 277 2012 - Group 2 (Talk | contribs) (Created page with "=Introduction= As the final part of the project, this section wraps the entire wiki together. It includes the product reassembly, as well as further analysis of the product. T...")
- 14:49, 14 December 2012 Group 11 - Dual Stage Snow Thrower (Gasoline Powered) - Gate 5 (hist) [2,259 bytes] MAE 277 2012 - Group 11 (Talk | contribs) (Created page with "== '''Gate 5 - Delivery (Group 11)''' == '''Purpose''' Gate 5 if the final stage of the project where we finalize and revise all the information we provided in the previ...")
- 00:30, 14 December 2012 Delivery/Gate 5 (hist) [10,286 bytes] MAE 277 2012 - Group 7 (Talk | contribs) (Created page with "=Gate 1= =Gate 2= =Gate 3= =Gate 4=")
- 21:49, 13 December 2012 Gate 5 - Delivery - Group 6 2012 (hist) [4,585 bytes] MAE 277 2012 - Group 6 (Talk | contribs) (Created page with "Click here to return to main page for Group 6. == Project Summary == The Kobalt ½ inch pneumatic impact wrench is an air powered t...")
- 20:11, 13 December 2012 Gate 5 - Delivery (Group 18) (hist) [2,311 bytes] MAE 277 2012 - Group 18 (Talk | contribs) (Created page with " == '''Gate 5 - Delivery (Group 18)''' == '''Purpose''' Gate 5 if the final stage of the project where we finalize and revise all the information we provided in the previo...")
- 15:33, 13 December 2012 Gate 5 - Group 12 - 2012 (hist) [7,258 bytes] MAE 277 2012 - Group 12 (Talk | contribs) (Created page with "==Introduction== ==Progression of Project Gates==")
- 14:30, 13 December 2012 Group 21 2012 Management (hist) [12,397 bytes] MAE 277 2012 - Group 21 (Talk | contribs) (Created page with "This is a reference page for Group 18. The timeline contains each gate and what is to be finished. Specific tasks were assigned to each group member and due dates were given. ...")
- 17:10, 12 December 2012 Nerf-N-Strike Delivery (hist) [237 bytes] MAE 277 2012 - Group 19 (Talk | contribs) (Created page with "=='''Purpose'''== =='''Project Management: Delivery'''== ==='''Finalization of Deliverables'''=== ==='''Final Assessment'''=== =='''Product Archeology: Documentation'''=...")
- 19:44, 9 December 2012 Alligator Lopper: Gate5 (hist) [11,429 bytes] MAE 277 2012 - Group 22 (Talk | contribs) (Created page with "='''Gate Five'''= =='''Management Proposal'''== Coming soon...")
- 16:35, 9 December 2012 '''Gate 1 Table 1''' -(Group 10) (hist) [269 bytes] MAE 277 2012 - Group 10 (Talk | contribs) (Created page with "Back to Group 10 Home Page-Group 10 - Snow Blower (Gasoline Powered) == Introduction == == Table 1 == This table is the list of questions from which we base the Product...")
- 16:02, 9 December 2012 Gate 2 table 1- (group 10) (hist) [107 bytes] MAE 277 2012 - Group 10 (Talk | contribs) (Created page with "450px")
- 15:46, 9 December 2012 Project Introduction Outline -(Group 10) (hist) [1,768 bytes] MAE 277 2012 - Group 10 (Talk | contribs) (Created page with "'''Product Description''' The product that we are going to analyze for this project will be a Bolens 726-01 dual-stage snow blower. This is a large, self propelled, snow blo...")
- 17:12, 6 December 2012 Group 25 - Snow Blower (Gasoline Powered)/Gate5 (hist) [1,127 bytes] MAE 277 2012 - Group 25 (Talk | contribs) (Created page with "=== Gate 5 : Gate Revisions of Previous Gates === ==Gate 1 ==")
- 10:06, 6 December 2012 Gate 2: Component Catalog (hist) [5,977 bytes] MAE 277 2012 - Group 5 (Talk | contribs) (Created page with ":'''Parts List:''' :::{|width="75%" class="wikitable" style="text-align: center" |'''Number'''||'''Part Name'''||'''Quantity'''||'''Material'''||'''Picture''' |- |1||Barrel E...")
- 18:29, 5 December 2012 Group 17: Gate 4: Product Explanation (hist) [26,519 bytes] MAE 277 2012 - Group 17 (Talk | contribs) (Created page with "=== Project Management: Critical Product Review === <br> ==== Cause for Corrective Action ==== <br> There were three major Issues that the Group had to overcome: finding comm...")
- 18:26, 5 December 2012 Group 17: Gate 3: Product Analysis (hist) [28,346 bytes] MAE 277 2012 - Group 17 (Talk | contribs) (Created page with "=== Project Management: Coordination Review === <br> ==== Cause for Corrective Action ==== <br> There were three major Issues that the Group has had to overcome: finding commo...")
- 18:24, 5 December 2012 Group 17: Gate 2: Product Dissection (hist) [16,059 bytes] MAE 277 2012 - Group 17 (Talk | contribs) (Created page with "===Challenges Thus Far=== <br> '''Lab Availability''' *The first challenge in dissecting the weed whacker was gaining access to space in the dissection lab. There was a limit...")
- 18:21, 5 December 2012 Group 17: Gate 1: Project Planning (hist) [8,031 bytes] MAE 277 2012 - Group 17 (Talk | contribs) (Created page with "===Work Proposal=== <br> '''Overview:''' <br> Proper analysis of the weedwhacker will require a full dissection. The weedwacker will be fully taken apart starting at the poi...")
- 13:19, 5 December 2012 Subsystem Evaluations -(Group 10) (hist) [19,607 bytes] MAE 277 2012 - Group 10 (Talk | contribs) (Created page with "'''Sub-systems''' *'''Linear Drive Assembly:''' The snow blower is driven by a 9 hp horizontal combustion engine. The power from this engine is transferred to two separate sy...")
- 13:14, 5 December 2012 Project Management: Preliminary Project Review -(Group 10) (Group 10) (hist) [2,758 bytes] MAE 277 2012 - Group 10 (Talk | contribs) (Created page with "The group as a whole has run very efficiently over the stage of Gate 2. The group’s documentation plan ended up being successful and went well through the dissection process...")
- 11:59, 5 December 2012 '''Product Archaeology''' -(Group 10) (hist) [12,830 bytes] MAE 277 2012 - Group 10 (Talk | contribs) (Created page with " '''Product Archaeology''' *'''Project planning Pofile''' :1.'''Development''' '''Product History''' The first snow blower was invented in 1925 by the Canadian inventor, Arth...")
- 11:56, 5 December 2012 Project Management: Management Proposal -(Group 10) (hist) [1,941 bytes] MAE 277 2012 - Group 10 (Talk | contribs) (Created page with "* '''Managment proposal''' :In order for our group to successfully reverse engineer our snow blower according to the standards set by our professors, we will need an organize...")
- 11:55, 5 December 2012 Project Management: Work Proposal gate 1 -(Group 10) (hist) [2,598 bytes] MAE 277 2012 - Group 10 (Talk | contribs) (Created page with "'''Project Management''' * '''Work Proposal''' :'''Disassembly''' The disassembly of the Bolens 726-01 gas powered snow blower is expected to take the larger amount of time v...")
- 11:37, 5 December 2012 Project Management:Management Proposal -(Group 10) (hist) [1,547 bytes] MAE 277 2012 - Group 10 (Talk | contribs) (Created page with "* '''Managment proposal''' :In order for our group to successfully reverse engineer our snow blower according to the standards set by our professors, we will need an organize...")
- 11:33, 5 December 2012 Project Management:Work Proposal gate 1 -(Group 10) (hist) [2,178 bytes] MAE 277 2012 - Group 10 (Talk | contribs) (Created page with "== Gate 1 == '''Project Management''' * '''Work Proposal''' :'''Disassembly''' The disassembly of the Bolens 726-01 gas powered snow blower is expected to take the larger amo...")
- 12:22, 30 November 2012 Gate 4 - Group 12 - 2012 (hist) [10,359 bytes] MAE 277 2012 - Group 12 (Talk | contribs) (Created page with "=Introduction= =Critical Project Review= ==Cause for Corrective Action== =Product Archaeology= ==Product Reassembly== ==Mechanisms== ==Design Revisions==")
- 19:57, 29 November 2012 Gate 4 - Product Explanation and Reassembly - Group 6 2012 (hist) [28,535 bytes] MAE 277 2012 - Group 6 (Talk | contribs) (Created page with "Click here to return to the main page for Group 6.")
- 18:56, 29 November 2012 Product Reassembly construction -(Group 10) (hist) [11,316 bytes] MAE 277 2012 - Group 10 (Talk | contribs) (Created page with "{|border="1" cellpadding="5" | align="center" style="background:#f0f0f0;"|'''Step number''' | align="center" style="background:#f0f0f0;"|'''Parts involved''' | align="center" ...")
- 17:08, 29 November 2012 Nerf-N-Stike Product Explanation (hist) [16,321 bytes] MAE 277 2012 - Group 19 (Talk | contribs) (Created page with "=='''Purpose'''== =='''Project Management: Critical Project Review'''== ==='''Cause for Corrective Action'''=== =='''Product Archeology: Product Explanation'''== ==='''Pro...")
- 17:07, 29 November 2012 Design Revisions gate 4 -(Group 10) (hist) [9,695 bytes] MAE 277 2012 - Group 10 (Talk | contribs) (Created page with "Back to Gate 4 home Gate 4 - Product Explanation (Group 10)")
- 17:07, 29 November 2012 Mechanisms -(Group 10) (hist) [3,920 bytes] MAE 277 2012 - Group 10 (Talk | contribs) (Created page with "Back to Gate 4 home Gate 4 - Product Explanation (Group 10)")
- 17:07, 29 November 2012 Project Management gate 4 -(Group 10) (hist) [1,471 bytes] MAE 277 2012 - Group 10 (Talk | contribs) (Created page with "Back to Gate 4 home Gate 4 - Product Explanation (Group 10)")
- 16:57, 29 November 2012 Assembly/Gate 4 (hist) [14,059 bytes] MAE 277 2012 - Group 7 (Talk | contribs) (Created page with "===Purpose=== After finishing up most of the analysis of the gun in the last gate, the team moved onto gate 4. In this gate, the main task that was worked on was reassembling...")
- 16:53, 29 November 2012 Dissection/Gate 2 (hist) [23,759 bytes] MAE 277 2012 - Group 7 (Talk | contribs) (Created page with "===Project Management=== As a group we executed our management plan relatively perfect and only faced a few minor difficulties. As far as our group meeting schedule went, we...")
- 16:52, 29 November 2012 Dissection- Gate 2 (hist) [23,760 bytes] MAE 277 2012 - Group 7 (Talk | contribs) (Created page with "===Project Management=== As a group we executed our management plan relatively perfect and only faced a few minor difficulties. As far as our group meeting schedule went, we...")
- 16:51, 29 November 2012 Gatee 2 (hist) [23,760 bytes] MAE 277 2012 - Group 7 (Talk | contribs) (Created page with "===Project Management=== As a group we executed our management plan relatively perfect and only faced a few minor difficulties. As far as our group meeting schedule went, we...")
- 16:49, 29 November 2012 Project Planning/Gate 1 (hist) [11,162 bytes] MAE 277 2012 - Group 7 (Talk | contribs) (Created page with "===Project Management=== This section will explain how we expect to dissect our Punisher Dart Gun. It will also discuss what we will need to dissect it, including tools, docu...")
- 16:45, 29 November 2012 Product Analysis/Gate1 (hist) [11,260 bytes] MAE 277 2012 - Group 7 (Talk | contribs) (Created page with "===Project Management=== This section will explain how we expect to dissect our Punisher Dart Gun. It will also discuss what we will need to dissect it, including tools, docu...")
- 13:51, 29 November 2012 Assembly Complexity Scale - (Group 10) (hist) [1,683 bytes] MAE 277 2012 - Group 10 (Talk | contribs) (Created page with "Our difficulty scale is based upon the amount of effort and time it took to complete each step in the directions list. Our scale starts at 1 and goes to 5 where 1 is least dif...")
- 13:37, 29 November 2012 Product Reassembly -(Group 10) (hist) [30,247 bytes] MAE 277 2012 - Group 10 (Talk | contribs) (Created page with "{|border="1" cellpadding="5" | align="center" style="background:#f0f0f0;"|'''Step number''' | align="center" style="background:#f0f0f0;"|'''Parts involved''' | align="center" ...")
- 12:12, 29 November 2012 Group 3 - Homelite Fluid Pump (Gasoline Powered) - Critical Project Review (hist) [2,643 bytes] MAE 277 2012 - Group 3 (Talk | contribs) (Created page with "<!-- Link back to Group 3 Home Page ; appears above the TOC --> Group 3 Home Page == Critical Project Review (Project Man...")
- 10:48, 29 November 2012 Clip Hook (hist) [471 bytes] MAE 277 2012 - Group 5 (Talk | contribs) (Created page with "=='''Component Summary'''== :*'''Component Name:''' Clip Hook :*'''Quantity:''' 1 :*'''Material:''' Plastic :*'''Manufacturing Process:''' Injection Molding :*'''Part Number:'...")
- 10:45, 29 November 2012 Base Connector 2 (hist) [446 bytes] MAE 277 2012 - Group 5 (Talk | contribs) (Created page with "=='''Component Summary'''== :*'''Component Name:''' Base Connector 1 :*'''Quantity:''' 1 :*'''Material:''' Plastic :*'''Manufacturing Process:''' Injection Molding :*'''Part N...")
- 10:44, 29 November 2012 Base Connector 1 (hist) [446 bytes] MAE 277 2012 - Group 5 (Talk | contribs) (Created page with "=='''Component Summary'''== :*'''Component Name:''' Base Connector 1 :*'''Quantity:''' 1 :*'''Material:''' Plastic :*'''Manufacturing Process:''' Injection Molding :*'''Part N...")
- 10:40, 29 November 2012 Internal Spacer (hist) [486 bytes] MAE 277 2012 - Group 5 (Talk | contribs) (Created page with "=='''Component Summary'''== :*'''Component Name:''' Internal Spacer :*'''Quantity:''' 1 :*'''Material:''' Plastic :*'''Manufacturing Process:''' Injection Molding :*'''Part Nu...")
- 23:56, 28 November 2012 Product Analysis/Gate 4 (hist) [6,218 bytes] MAE 277 2012 - Group 7 (Talk | contribs) (Created page with "===Assembly===")
- 19:37, 28 November 2012 Alligator Lopper: Gate4 (hist) [39,909 bytes] MAE 277 2012 - Group 22 (Talk | contribs) (Created page with "=='''Gate Four'''== ==='''Product Reassembly'''=== ==='''Mechanisms'''=== '''Spring''' ==='''Design Revision'''===")
- 16:31, 28 November 2012 Gate 4: Product Reassembly (hist) [10,441 bytes] MAE 277 2012 - Group 23 (Talk | contribs) (Created page with "=Gate Overview= After dis-assembling the Daiwa Baitcast Reel (Right Hand Retrieve), and performing a complete thorough analysis of its internal workings, our next task remains...")
- 16:03, 28 November 2012 Group 11 - Dual Stage Snow Thrower (Gasoline Powered) - Gate 4 (hist) [15,620 bytes] MAE 277 2012 - Group 11 (Talk | contribs) (Created page with "==Intro== ==Final Critical Review== ==Product Reassembly== '''Procedure'''<br /> '''Mechanisms'''<br /> '''Possible Design Revisions'''<br /> 1: 2: 3: ==Techn...")