Group 11 - Dual Stage Snow Thrower (Gasoline Powered) - Gate 5
Contents |
Gate 5 - Delivery (Group 11)
Purpose
Gate 5 It is the final stage of the project where we finalize and revise all the information we provided in the previous Gates so that it can be used as a technical report. In this Gate, we provide an oral presentation, and give a executive summury This gate shall contain:
- Project Management: Delivery
- Product Archaeology: Documentation
- Oral Presentation
Project Management Delivary
Finalization of Deliverables
This part of the gate involves fixing errors in the previous gate, such as grammatical error, mis-information, and reformatting. Some of the changes are:
- Formatting the page layout of the main Group 11 page as well as the Gates
- Adding more pictures in the gates
- Add executive summery on front page
- Reformatting pictures
- Making several changes on the content of the gates
Final Assessment
Each group member will fill out a group assessment form which will evaluate the contributions of each group member so that points can be awarded accordingly. This form will be sent out to all group member on the last day of class.
Product Archaeology: Documentation
Technical Report
The final technical report is presented as the combination of Gate 1 to Gate 4. Revisions in each gate has been made as according to the recommendations of the professors. We also provided an executive summary on the main Group 11 page which summarizes out project, from information about our product to the information we gathered form conducting the gates.
Oral Presentation
Our group also prepared a 5 minute presentation that introduces our product to the rest of the class and details a design revision that we think should be made to the Dual Stage Snow Thrower (Gasoline Powered), taking into account the GSEE factors.
The group communication Minh Dao, presented the powerpoint presentation to the class.