Gate 5 Content
Contents |
Purpose
In this gate we will be doing revisions on our previous gates, while also completing our in class presentation.
Revisions
Revision Made (Points Originally Taken Off)
Gate 1:(Original Grade - 71)
Gantt Chart ( 2 )
Specific 3D modeling program ( 3 )
Time duration per task ( 2 )
What is expected to be done at the meeting ( 1 )
Purpose of each meeting ( 2 )
Where will group meet ( 2 )
Specific roles of group members ( 2 )
Figure numbers, captions ( 2 )
How many components are used ( 3 )
complexity definition ( 3 )
Specific metals used ( 1 )
How to change direction of chute ( 1 )
Alternative profile costs ( 1 )
Professionalism ( 4 )
Gate 2: (Original Grade-46)
Specifics on how the plan worked ( 1 )
Rotar Assembly ( 1 )
How difficult was each step ( 3 )
Is the part intended to be dissassembled ( 4 )
Document the connection of subsystems ( 35 )
Pictures could show better dissection ( 5 )
Support Discussion ( 5 )
Gate 3: (Original Grade-63)
Work load distribution ( 2 )
Component function ( 5 )
Shape coupled with function ( 7 )
Complexity function ( 3 )
Solid Modeling Package used ( 1 )
Engineering Analysis ( 5 )
How much easier it is to use pull start ( 5 )
Imagery ( 1 )
Extra functional model added ( 1 )
Gate 4: (Original Grade-72)
Formalize Language ( 2 )
Difficulty scale ( 5 )
Methods and tools ( 5 )
Differences ( 5 )
Economics ( 2 )
Not enough photos ( 2 )
Imagery ( 5 )
Proof read ( 2 )
Oral Presentation
- Group 24 Oral Presentation