Group 6 - Toro CCR 2400 E GTS Snow-blower
From GICLWiki
(Difference between revisions)
(→Project Overview) |
|||
| Line 1: | Line 1: | ||
==Project Overview== | ==Project Overview== | ||
| − | - | + | |
| + | For MAE 277 Group 6 will be dissecting and analyzing the internal workings of the Toro CCr 2400 E GTS Snow-blower. The process will be documented in a professional fashion. The end product will be technical reports in the form of five separate Gates. | ||
===Team Members=== | ===Team Members=== | ||
| Line 7: | Line 8: | ||
*'''Joe Groele''' - Dissection Specialist | *'''Joe Groele''' - Dissection Specialist | ||
*'''Tyler Salamone''' - Project Master | *'''Tyler Salamone''' - Project Master | ||
| − | |||
==Gate 1: Project Planning== | ==Gate 1: Project Planning== | ||
Revision as of 03:18, 10 October 2011
Contents |
Project Overview
For MAE 277 Group 6 will be dissecting and analyzing the internal workings of the Toro CCr 2400 E GTS Snow-blower. The process will be documented in a professional fashion. The end product will be technical reports in the form of five separate Gates.
Team Members
- Chris O'Connell - 3D Modeling Specialist
- Andrew Lyons - Webmaster
- Joe Groele - Dissection Specialist
- Tyler Salamone - Project Master
Gate 1: Project Planning
The first stage of the project contains two main categories in which the process of dis-assembly which will be planned. Follow the link below to view the full report.
Project Management
- Work Proposal
- Management Proposal
Product Archaeology
- This section contains various profiles which explain important aspects of our products design.