Group 5 - Kawasaki Compressor 2

From GICLWiki
Revision as of 17:43, 30 September 2010 by MAE 277 2010 Group 5 (Talk | contribs)
Jump to: navigation, search

Contents

Group Members

1. Donald Pangrazio
2. Donovan Southwell
3. Maxwell Urban
4. Sourobh Ghosh
5. Tara Harten

Introduction

Our group has been assigned one of the Kawasaki Air Compressors. Our main goals are to understand how this product works as a whole and how each individual component works. We will do this by disassembling the entire product and then reassembling after all of our assessments. Our plans, time management, and individual roles are explained in further detail on our Gate 1 page. To see our progress and conclusions refer to each individual gate page as time goes on.

Source: http://www.usedcalgary.com/classified-ad/Kawasaki-8-Gallon-Air-Compressor-with-Nailer-and-Muffle_12716911

Gate 1: Project Planning

Gate 1 is the planning stage of our project. The planning stage includes our:

-Work Proposal
-Management Proposal
-Preparation and Initial Assessment

Our Work Proposal has an overview of how our group plans to disassemble the compressor, what tools we will need, an estimate of how long it will take, and challenges we might face. Our Management Proposal has our list of our member's jobs and capabilities. The Preparation and Initial Assessment includes all of our profiles of our product without any dissection of the product itself. Click the link below for our Gate 1.
"Gate 1"

Gate 2: Product Dissection

Click for "Gate 2"

Gate 3: Product Analysis

Click for "Gate 3"

Gate 4: Product Explanation

Click here for Gate 4

Gate 5: Delivery

Click here for Gate 5

Personal tools