Group 5 - Kawasaki Compressor 2
(→Introduction) |
(→Gate 1) |
||
| Line 18: | Line 18: | ||
-Preparation and Initial Assessment <br> | -Preparation and Initial Assessment <br> | ||
</blockquote> | </blockquote> | ||
| − | Our Work Proposal has an overview of how our group plans to disassemble the compressor, what tools we will need, an estimate of how long it will take, and challenges we might face. Our Management Proposal | + | Our Work Proposal has an overview of how our group plans to disassemble the compressor, what tools we will need, an estimate of how long it will take, and challenges we might face. Our Management Proposal has our list of our member's jobs and capabilities. The Preparation and Initial Assessment includes all of our profiles of our product without any dissection of the product itself. Click the link below for our Gate 1. |
<br>[http://gicl.cs.drexel.edu/wiki/Group_5_-_Kawasaki_Compressor_2_Gate_1 "Gate 1"] | <br>[http://gicl.cs.drexel.edu/wiki/Group_5_-_Kawasaki_Compressor_2_Gate_1 "Gate 1"] | ||
Revision as of 17:38, 30 September 2010
Contents |
Group Members
1. Donald Pangrazio
2. Donovan Southwell
3. Maxwell Urban
4. Sourobh Ghosh
5. Tara Harten
Introduction
Our group has been assigned one of the Kawasaki Air Compressors. Our main goals are to understand how this product works as a whole and how each individual component works. We will do this by disassembling the entire product and then reassembling after all of our assessments. Our plans, time management, and individual roles are explained in further detail on our Gate 1 page. To see our progress and conclusions refer to each individual gate page as time goes on.
Gate 1
Gate 1 is the planning stage of our project. The planning stage includes our:
-Work Proposal
-Management Proposal
-Preparation and Initial Assessment
Our Work Proposal has an overview of how our group plans to disassemble the compressor, what tools we will need, an estimate of how long it will take, and challenges we might face. Our Management Proposal has our list of our member's jobs and capabilities. The Preparation and Initial Assessment includes all of our profiles of our product without any dissection of the product itself. Click the link below for our Gate 1.
"Gate 1"
Gate 2
Click here for Gate 2
Gate 3
Click here for Gate 3
Gate 4
Click here for Gate 4
Gate 5
Click here for Gate 5
