Group 4 - DeWalt 1/2 in Hammerdrill (Corded)
From GICLWiki
(Difference between revisions)
(→Introduction) |
|||
| Line 1: | Line 1: | ||
| − | |||
| − | |||
== Introduction == | == Introduction == | ||
| − | |||
[[Image:Dewalthammerdrill.JPG|thumb|right|DeWalt 1/2 in Hammerdrill (Corded)]] | [[Image:Dewalthammerdrill.JPG|thumb|right|DeWalt 1/2 in Hammerdrill (Corded)]] | ||
| − | + | [[Image:hammerdrilltool.JPG|thumb|right|DeWalt 1/2 in Hammerdrill (Corded)]] | |
Work in progress... | Work in progress... | ||
| − | |||
== Project Gates == | == Project Gates == | ||
[[Gate 1 - Group 4]]: Preparation and Initial Assessment | [[Gate 1 - Group 4]]: Preparation and Initial Assessment | ||
| − | |||
[[Gate 2 - Group 4]]: Excavation (Dissection) | [[Gate 2 - Group 4]]: Excavation (Dissection) | ||
| − | |||
[[Gate 3 - Group 4]]: Evaluation | [[Gate 3 - Group 4]]: Evaluation | ||
| − | |||
[[Gate 4 - Group 4]]: Explanation | [[Gate 4 - Group 4]]: Explanation | ||
| − | |||
[[Gate 5 - Group 4]]: Documentation | [[Gate 5 - Group 4]]: Documentation | ||
Revision as of 22:23, 7 October 2012
Introduction
Work in progress...
Project Gates
Gate 1 - Group 4: Preparation and Initial Assessment Gate 2 - Group 4: Excavation (Dissection) Gate 3 - Group 4: Evaluation Gate 4 - Group 4: Explanation Gate 5 - Group 4: Documentation