*Group Member Background<br> | *Group Member Background<br> | ||
| − | * | + | *Management Proposal<br> |
| + | *Work Propsal | ||
*Group Analysis<br> | *Group Analysis<br> | ||
| + | *Disassembly Plan | ||
*Pre-Dissection Analysis</blockquote> | *Pre-Dissection Analysis</blockquote> | ||
[[Group 3 - Kawasaki Compressor - Gate 1|Gate 1 of Kawasaki Compressor Project]] | [[Group 3 - Kawasaki Compressor - Gate 1|Gate 1 of Kawasaki Compressor Project]] | ||
Revision as of 23:58, 30 September 2010
Contents |
Introduction
We are a group of five engineering students taking an MAE 277 Intro to M.E. course at University at Buffalo. During the course of the semester, our group will be analyzing, dissecting, documenting, and reassembling a Kawasaki Air Compressor. We hope to not only gain knowledge of the product at hand, but also learn how to plan according and work as a team to build and analyze a detailed report about our subject.
Group members
- Bob Neuman: rmneuman@buffalo.edu
- Brian Webb: brianweb@buffalo.edu
- Tyler Morris: tylermor@buffalo.edu
- Will Sassenhausen: wtsassen@buffalo.edu
- Joe Bruzgul: jpbruzgu@buffalo.edu
Gate 1
Here is a link to Gate 1 of our project outlining:
Gate 1 of Kawasaki Compressor Project
- Group Member Background
- Management Proposal
- Work Propsal
- Group Analysis
- Disassembly Plan
- Pre-Dissection Analysis
Gate 2
Here is a link to Gate 2 of our project
Gate 2
Gate 3
Here is a link to Gate 3 of our project
Gate 3
Gate 4
Here is a link to Gate 4 of our project
Gate 4