Group 3 - Homelite Fluid Pump (Gasoline Powered)

From GICLWiki
(Difference between revisions)
Jump to: navigation, search
(7 intermediate revisions by one user not shown)
Line 22: Line 22:
 
==Product Proposal==
 
==Product Proposal==
  
A link to an electronic copy of Group 3's [[G3_ProductProposal.pdf|Product Proposal]] document.
+
A link to an electronic copy of Group 3's [[media:G3_ProductProposal.pdf|Product Proposal]] document.
  
 
==Project Gates==
 
==Project Gates==
Line 28: Line 28:
 
=== Gate 1: Project Planning===
 
=== Gate 1: Project Planning===
  
[[Group_3_-_Homelite_Fluid_Pump_(Gasoline_Powered) - Work Proposal|Work Proposal]]
+
[[Group_3_-_Homelite_Fluid_Pump_(Gasoline_Powered) - Work Proposal|Work Proposal]]:
"Description of Work Proposal"
+
''How we plan to reverse engineer our product.''
  
[[Group_3_-_Homelite_Fluid_Pump_(Gasoline_Powered) - Management Proposal|Management Proposal]]
+
[[Group_3_-_Homelite_Fluid_Pump_(Gasoline_Powered) - Management Proposal|Management Proposal]]:
"Description of Management Proposal"
+
''How we plan to manage the Group to meet project requirements.''
  
[[Group_3_-_Homelite_Fluid_Pump_(Gasoline_Powered) - Initial Assessment|Initial Assessment]]
+
[[Group_3_-_Homelite_Fluid_Pump_(Gasoline_Powered) - Initial Assessment|Initial Assessment]]:
"Description of Initial Assessment"
+
''A thorough analysis of our product - without performing dissection''
  
 
=== Gate 2: Product Dissection ===
 
=== Gate 2: Product Dissection ===
[[Group_3_-_Homelite_Fluid_Pump_(Gasoline_Powered)_-_Preliminary_Project_Review|Preliminary Project Review]]
+
[[Group_3_-_Homelite_Fluid_Pump_(Gasoline_Powered)_-_Preliminary_Project_Review|Preliminary Project Review]]:
"Description of Preliminary Project Review"
+
''An assessment of [[Group_3_-_Homelite_Fluid_Pump_(Gasoline_Powered)_-_Work_Proposal|Work]] and [[Group_3_-_Homelite_Fluid_Pump_(Gasoline_Powered)_-_Management_Proposal|Management]] Plans from [[#Gate 1: Project Planning|Gate 1]] above.''
  
[[Group_3_-_Homelite_Fluid_Pump_(Gasoline_Powered)_-_Product_Dissection|Product Dissection]]
+
[[Group_3_-_Homelite_Fluid_Pump_(Gasoline_Powered)_-_Product_Dissection|Product Dissection]]:
"Description of Product Dissection"
+
''Includes disassembly of the product.  This is the first physical dissection experience.''
 +
 
 +
=== Gate 3: Product Dissection ===
 +
[[Group_3_-_Homelite_Fluid_Pump_(Gasoline_Powered)_-_Coordination_Review|Coordination Review]]:
 +
''Documentation of past and present challenges and resolutions''
 +
 
 +
[[Group_3_-_Homelite_Fluid_Pump_(Gasoline_Powered)_-_Product_Evaluation|Product Evaluation]]:
 +
''Analysis of the disassembled product''
 +
 
 +
=== Gate 4: Product Explanation ===
 +
[[Group_3_-_Homelite_Fluid_Pump_(Gasoline_Powered)_-_Critical_Project_Review|Critical Project Review]]:
 +
''Documentation of past and present challenges and resolutions''
 +
 
 +
[[Group_3_-_Homelite_Fluid_Pump_(Gasoline_Powered)_-_Product_Explanation|Product Explanation]]:
 +
''Explanation of the product's mechanisms & reassembly including design revision proposals''

Revision as of 14:05, 26 November 2012

Contents

Introduction

MAE 277 Course Project Overview:

This group project strives to give students a broader perspective on engineering decisions, providing context for the skills taught in the class. Additionally, it exposes students to basic project and group management tasks. The project affords students an opportunity to demonstrate a mastery of their skills in critical thinking, information synthesis, engineering analysis, technical communication, and other categories.

Product Description

The subject of Group 3's product dissection is a Homelite brand fluid pump (Pictured below in two opposing views).


Homelite Fluid Pump - Left-Front-Top View
Homelite Fluid Pump - Right-Back-Top View

Product Proposal

A link to an electronic copy of Group 3's Product Proposal document.

Project Gates

Gate 1: Project Planning

Work Proposal: How we plan to reverse engineer our product.

Management Proposal: How we plan to manage the Group to meet project requirements.

Initial Assessment: A thorough analysis of our product - without performing dissection

Gate 2: Product Dissection

Preliminary Project Review: An assessment of Work and Management Plans from Gate 1 above.

Product Dissection: Includes disassembly of the product. This is the first physical dissection experience.

Gate 3: Product Dissection

Coordination Review: Documentation of past and present challenges and resolutions

Product Evaluation: Analysis of the disassembled product

Gate 4: Product Explanation

Critical Project Review: Documentation of past and present challenges and resolutions

Product Explanation: Explanation of the product's mechanisms & reassembly including design revision proposals

Personal tools