Group 3 - Homelite Fluid Pump (Gasoline Powered)
From GICLWiki
(Difference between revisions)
(→Product Description) |
|||
| Line 32: | Line 32: | ||
[[Group_3_-_Homelite_Fluid_Pump_(Gasoline_Powered) - Initial Assessment|Initial Assessment]] | [[Group_3_-_Homelite_Fluid_Pump_(Gasoline_Powered) - Initial Assessment|Initial Assessment]] | ||
"Description of Initial Assessment" | "Description of Initial Assessment" | ||
| + | |||
| + | === Gate 2: Product Dissection === | ||
| + | [[Group_3_-_Homelite_Fluid_Pump_(Gasoline_Powered)_-_Preliminary_Project_Review|Preliminary Project Review]] | ||
| + | "Description of Preliminary Project Review" | ||
| + | |||
| + | [[Group_3_-_Homelite_Fluid_Pump_(Gasoline_Powered)_-_Product_Dissection|Product Dissection]] | ||
| + | "Description of Product Dissection" | ||
Revision as of 14:57, 20 October 2012
Contents |
Introduction
MAE 277 Course Project Overview:
This group project strives to give students a broader perspective on engineering decisions, providing context for the skills taught in the class. Additionally, it exposes students to basic project and group management tasks. The project affords students an opportunity to demonstrate a mastery of their skills in critical thinking, information synthesis, engineering analysis, technical communication, and other categories.
Product Description
The subject of Group 3's product dissection is a Homelite brand fluid pump (Pictured below in two opposing views).
Project Gates
Gate 1: Project Planning
Work Proposal "Description of Work Proposal"
Management Proposal "Description of Management Proposal"
Initial Assessment "Description of Initial Assessment"
Gate 2: Product Dissection
Preliminary Project Review "Description of Preliminary Project Review"
Product Dissection "Description of Product Dissection"