Group 2 - Honda Generator 2
m (→Gate 3: Product Analysis) |
m (→Gate 5: Documentation and Delivery) |
||
| Line 72: | Line 72: | ||
==Gate 5: Documentation and Delivery== | ==Gate 5: Documentation and Delivery== | ||
| + | |||
| + | The link below navigates to the <u>Gate 5: Documentation and Delivery</u> page which includes: | ||
| + | |||
| + | :Work Proposal | ||
| + | |||
| + | :Management Proposal | ||
| + | |||
| + | :Initial Assessment | ||
| + | |||
| + | [[Documentation and Delivery]] | ||
Revision as of 22:14, 30 September 2010
Contents |
Introduction
Product Overview
The 7000 Watt Honeywell generator, powered by Honda, was designed to give the consumer a portable, gas powered form of power that can be used on many different tools and appliances. This product was provided to the public to use in areas or situations where power is not available, whether it be away from home or during a power outage. The generator is easy to use and comes with an easy start-up guide.
Team Overview
Given the task of analyzing a Honda Generator, our team divided the work evenly and each member was given a specific role:
- Eric Wettlaufer: Chief Dissector and Parts Technician
- Nick Marucci: Work Manager and Assistant Dissector/Reassembler
- Mary Kate Baker: Head Documenter and Website Developer
- Joseph Robison: Chief Editor and Technical Writer and Assistant Dissector/Re-assembler
- John Vinti: Project Manager
Project Gates
Gate 1: Request For Proposal
The link below navigates to the Gate 1: Request For Proposal page which includes:
- Work Proposal
- Management Proposal
- Initial Assessment
Gate 2: Product Dissection
The link below navigates to the Gate 2: Product Dissection page which includes:
- Work Proposal
- Management Proposal
- Initial Assessment
Gate 3: Product Analysis
The link below navigates to the Gate 3: Product Analysis page which includes:
- Work Proposal
- Management Proposal
- Initial Assessment
Gate 4: Product Explanation
The link below navigates to the Gate 4: Product Explanation page which includes:
- Work Proposal
- Management Proposal
- Initial Assessment
Gate 5: Documentation and Delivery
The link below navigates to the Gate 5: Documentation and Delivery page which includes:
- Work Proposal
- Management Proposal
- Initial Assessment