Group 29 - Homelite Line Trimmer
MAE277 29 09 (Talk | contribs) |
MAE277 29 09 (Talk | contribs) |
||
| Line 43: | Line 43: | ||
<br> | <br> | ||
<u>Date Submitted:</u> December 7, 2009 | <u>Date Submitted:</u> December 7, 2009 | ||
| + | |||
| + | <br><br> | ||
| + | == Gate V: Final Report Delivery == | ||
| + | <br> | ||
| + | <u>Date Submitted:</u> December 14, 2009 | ||
Revision as of 02:57, 8 December 2009
Note: For optimal viewing of the content on this page, please maximize the size of the window of your given internet browser.
Contents |
Gate I: Request for Proposal
Below are arranged, in sequence, links to the subsections constituting the Request for Proposal.
Link: Work Proposal
Link: Management Proposal
Link: Initial Product Assessment
Date Submitted: October 10, 2009
Gate II: Preliminary Project Review
The following links entail the Causes for Corrective Action and the Product Dissection Plan of the Preliminary Project Review.
Link: Causes for Corrective Action
Link: Product Dissection Plan
Date Submitted: October 30, 2009
Gate III: Coordination Review
The links below lead to the subsections (Component Summary, Design Revisions, Solid Modeled Assembly, and Engineering Analysis, respectively) comprising the Coordination Review. Access to the subsection References to Supplementary Material is provided in the Engineering Analysis, the content of which corresponds with the noted references to outside literature and kindred online sources of the former.
Link: Component Summary
Link: Design Revisions
Link: Solid Modeled Assembly
Link: Engineering Analysis
Date Submitted: November 30, 2009
Gate IV: Critical Project Review
The following links to the Product Reassembly Plan constituting the Critical Project Review.
Link: Product Reassembly Plan
Date Submitted: December 7, 2009
Gate V: Final Report Delivery
Date Submitted: December 14, 2009