Group 29 - Homelite Line Trimmer
MAE277 29 09 (Talk | contribs) |
MAE277 29 09 (Talk | contribs) |
||
| Line 3: | Line 3: | ||
[[image:full.jpg|thumb|right|Homelite Versatool Line Trimmer. Click to view a higher resolution of the image.|300px]] | [[image:full.jpg|thumb|right|Homelite Versatool Line Trimmer. Click to view a higher resolution of the image.|300px]] | ||
[[image:weedwackerimage.jpg|thumb|right|A more recent model of the Homelite Versatool Line Trimmer|300px]] | [[image:weedwackerimage.jpg|thumb|right|A more recent model of the Homelite Versatool Line Trimmer|300px]] | ||
| − | <br> | + | <br><br> |
== Gate I: Request for Proposal == | == Gate I: Request for Proposal == | ||
Below are arranged, in sequence, links to the subsections constituting the '''Request for Proposal'''. | Below are arranged, in sequence, links to the subsections constituting the '''Request for Proposal'''. | ||
| Line 11: | Line 11: | ||
<br> | <br> | ||
| + | <u>Date Submitted:</u> October 10, 2009 | ||
| + | |||
| + | <br><br> | ||
== Gate II: Preliminary Project Review == | == Gate II: Preliminary Project Review == | ||
The following links entail the ''Causes for Corrective Action'' and the ''Product Dissection Plan'' of the '''Preliminary Project Review'''. | The following links entail the ''Causes for Corrective Action'' and the ''Product Dissection Plan'' of the '''Preliminary Project Review'''. | ||
=== [[Link: Causes for Corrective Action]] === | === [[Link: Causes for Corrective Action]] === | ||
=== [[Link: Product Dissection Plan]] === | === [[Link: Product Dissection Plan]] === | ||
| − | |||
<br> | <br> | ||
| + | <u>Date Submitted:</u> October 30, 2009 | ||
| + | |||
| + | <br><br> | ||
== Gate III: Coordination Review == | == Gate III: Coordination Review == | ||
| Line 26: | Line 31: | ||
=== [[Link: Solid Modeled Assembly]] === | === [[Link: Solid Modeled Assembly]] === | ||
=== [[Link: Engineering Analysis]] === | === [[Link: Engineering Analysis]] === | ||
| − | |||
<br> | <br> | ||
| + | <u>Date Submitted:</u> November 30, 2009 | ||
| + | |||
| + | <br><br> | ||
== Gate IV: Critical Project Review == | == Gate IV: Critical Project Review == | ||
Revision as of 09:56, 3 December 2009
Note: For optimal viewing of the content on this page, please maximize the size of the window of your given internet browser.
Contents |
Gate I: Request for Proposal
Below are arranged, in sequence, links to the subsections constituting the Request for Proposal.
Link: Work Proposal
Link: Management Proposal
Link: Initial Product Assessment
Date Submitted: October 10, 2009
Gate II: Preliminary Project Review
The following links entail the Causes for Corrective Action and the Product Dissection Plan of the Preliminary Project Review.
Link: Causes for Corrective Action
Link: Product Dissection Plan
Date Submitted: October 30, 2009
Gate III: Coordination Review
The links below lead to the subsections (Component Summary, Design Revisions, Solid Modeled Assembly, and Engineering Analysis, respectively) comprising the Coordination Review. Access to the subsection References to Supplementary Material is provided in the Engineering Analysis, the content of which corresponds with the noted references to outside literature and kindred online sources of the former.
Link: Component Summary
Link: Design Revisions
Link: Solid Modeled Assembly
Link: Engineering Analysis
Date Submitted: November 30, 2009
Gate IV: Critical Project Review
The following links to the Product Reassembly Plan constituting the Critical Project Review.