Group 26 - Pressure Washer
MAE277 26 09 (Talk | contribs) (→Gate 4: Critical Project Review) |
MAE277 26 09 (Talk | contribs) |
||
| Line 25: | Line 25: | ||
== Gate 4: Critical Project Review == | == Gate 4: Critical Project Review == | ||
[[Product Reassembly Plan for Group 26|Product Reassembly Plan]]<br> | [[Product Reassembly Plan for Group 26|Product Reassembly Plan]]<br> | ||
| + | ==Gate 5: Delivery == | ||
| + | ===References=== | ||
| + | The references were used during the Reverse Engineering Design Project to help the group gain a better understanding of the engine and its components. | ||
| + | *http://ipl.ordertree.com/ipl/742/870370_Manual_Eng.pdf ---Snap-on manual for pressure washer | ||
| + | *http://www.patentstorm.us/patents/5461776/description.html ---- for piston rings | ||
| + | *http://en.wikipedia.org/wiki/Manufacturing ---- manufacturing in general | ||
| + | *http://en.wikipedia.org/wiki/Metalworking ---- reference manufacturing processes to certain materials | ||
Revision as of 00:45, 16 December 2009
Contents |
Introduction
A requirement for MAE277, taught by Erich Devendorf, the Reverse Engineering Project is designed to help students familiarize themselves with the assembly of a product. Over the course of the semester, the students will work on five gates which will showcase the ongoing analysis of their products. This project will reinforce key skills that engineers utilize everyday.
Groups 25 and 26 were assigned a pressure washer. Rather than share entire product between two groups, the product was divided into two, with group 25 analyzing the compressor and with group 26 analyzing the engine.
Gate 1: Request for Proposal
This portion of the Reverse Engineering Project is designed to help the group become familiarized with the product, a pressure washer. A general work outline for the semester will be developed and will contain the following items: a work proposal, a management proposal, and an initial product assessment.
Work Proposal
Management Proposal
Initial Product Assessment
Gate 2: Preliminary Project Review
Causes for Corrective Action
Product Dissection Plan
Gate 3: Coordination Review
Component Summary
Design Revisions
Solid Modeled Assembly
Engineering Analysis
Gate 4: Critical Project Review
Gate 5: Delivery
References
The references were used during the Reverse Engineering Design Project to help the group gain a better understanding of the engine and its components.
- http://ipl.ordertree.com/ipl/742/870370_Manual_Eng.pdf ---Snap-on manual for pressure washer
- http://www.patentstorm.us/patents/5461776/description.html ---- for piston rings
- http://en.wikipedia.org/wiki/Manufacturing ---- manufacturing in general
- http://en.wikipedia.org/wiki/Metalworking ---- reference manufacturing processes to certain materials
