Group 24 - Toro Snowblower 2
From GICLWiki
(Difference between revisions)
(→Gate 2: Product Dissection) |
(→Gate 3: Product Analysis) |
||
| Line 53: | Line 53: | ||
===Gate 3: Product Analysis=== | ===Gate 3: Product Analysis=== | ||
| + | -Coordination Review <br/> | ||
| + | -Product Evaluation <br/> | ||
| + | |||
| + | |||
| + | [[Gate 3 Content]] | ||
===Gate 4: Product Explanation=== | ===Gate 4: Product Explanation=== | ||
===Gate 5: Documentation and Delivery=== | ===Gate 5: Documentation and Delivery=== | ||
Revision as of 20:40, 16 November 2010
| University at Buffalo MAE 277 |
Contents |
Introduction
This page contains the first gate of group 24’s MAE 277 project. The purpose of this project is to present the information that is accumulated through our research and dissection. During the course of this project, our group will assemble and disassemble a 20 inch 3.5 horse power snow blower. All of the information collected during the disassembly and reassembly of the snow blower will be organized and documented on this wiki page.
| Group member | |
| Chris Chase | cdchase@buffalo.edu |
| Eric Bailen | ericbail@buffalo.edu |
| Josh Ulrich | joshuaul@buffalo.edu |
| Ryan Scall | ryanscal@buffalo.edu |
| Cormac Canales | Dropped class |
| Tom Oates | Dropped class |
Project Gates
Gate 1: Preliminary Design Review
-Work Proposal
-Management Proposal
-Initial Assessment
Gate 2: Product Dissection
-Preliminary Project Review
-Product Dissection
-Product Dissection Assessment
Gate 3: Product Analysis
-Coordination Review
-Product Evaluation
