Group 20 - Ford Mustang Power Wheels

From GICLWiki
(Difference between revisions)
Jump to: navigation, search
Line 141: Line 141:
  
 
==Gate 1 - Project Planning ==
 
==Gate 1 - Project Planning ==
[[Group 20 - Ford Mustang Power Wheels - Gate 1|Project Planning]]
+
In Gate 1, we assess the project, our product, and our team members.  We put together a work proposal, a management proposal, and an initial assessment to help us manage our time and resources as we begin our project.
 +
*[[Group 20 - Ford Mustang Power Wheels - Gate 1|Gate 1 - Project Planning]]
  
 
==Gate 2 - Product Dissection==
 
==Gate 2 - Product Dissection==
[[Group 20 - Ford Mustang Power Wheels - Gate 2|Product Dissection]]
+
*[[Group 20 - Ford Mustang Power Wheels - Gate 2|Gate 2 - Product Dissection]]
  
 
==Gate 3 - Product Analysis==
 
==Gate 3 - Product Analysis==
[[Group 20 - Ford Mustang Power Wheels - Gate 3|Product Analysis]]
+
*[[Group 20 - Ford Mustang Power Wheels - Gate 3|Gate 3 - Product Analysis]]
  
 
==Gate 4 - Product Explanation==
 
==Gate 4 - Product Explanation==
[[Group 20 - Ford Mustang Power Wheels - Gate 4|Product Explanation]]
+
*[[Group 20 - Ford Mustang Power Wheels - Gate 4|Gate 4 - Product Explanation]]
  
 
==Gate 5 - Delivery==
 
==Gate 5 - Delivery==

Revision as of 12:57, 30 September 2010

Group 20 - Ford Mustang Power Wheels
G20 fordmustang main edited.jpg
Figure 1: Fully assembled product.
Name of Artifact Ford Mustang Power Wheels
Manufacturer Fisher Price
Assembled in MonterreyMexico
Cost 300.00 USD

Contents

Introduction

Product Overview

The Power Wheels Ford Mustang is a toy car modeled after its real life counterpart. It is battery powered, and it functions in much the same way as a real vehicle would. It is designed for young children of ages 3 to 6 years old, and can operate indoors, on pavement and on grass.

Team Overview

Our team is tasked with analyzing the Power Wheels Ford Mustang and presenting our findings on this wiki page, in individual gates. Each team member has a specific role to play in this project:

  • Mike Rossi: On-Site Manager
  • Zach Wilson: Remote Manager
  • Christopher Michels: Technical Editor in Chief
  • Joseph Glab: Head of Web Development
  • David Fijas: Head of Dissection Documentation
  • Shane Seefeldt: Head Dissection Specialist

Project Gates

Gate 1 - Project Planning

In Gate 1, we assess the project, our product, and our team members. We put together a work proposal, a management proposal, and an initial assessment to help us manage our time and resources as we begin our project.

Gate 2 - Product Dissection

Gate 3 - Product Analysis

Gate 4 - Product Explanation

Gate 5 - Delivery

Personal tools