Group 20 - Black and Decker Jigsaw JS510G
From GICLWiki
Revision as of 15:31, 14 December 2011 by MAE 277 2011 Group20 (Talk | contribs)
Contents |
Executive Summary
Final Report
Gate 1
Gate 1 documents the planning stage for the upcoming tasks.
Included in this gate:
- Points of Contact
- Team member’s responsibility
- Project timeline
- Detailed analysis of the product.
Gate 2
Gate 2 involves the dissection of the product.
Included in this gate:
- Disassembly Table
- Subsystem analysis
- Four factors’ influence
Gate 3
The purpose of Gate 3 is a detailed analysis at the component and subsystem level.
Included in this gate:
- Component Summary
- Product Analysis
- Solid Modeling Assembly
- Manufacturing processes
- Design revisions
Gate 4
Gate 4 includes the reassembly of the product.
Included in this gate:
- Reassembly Table
- Comparison to the Disassembly
- System Level design revisions
