Group 20 - Black and Decker Jigsaw JS510G
From GICLWiki
Revision as of 14:31, 14 December 2011 by MAE 277 2011 Group20 (Talk | contribs)
Contents |
Overview
Gate 1
Gate 1 documents the planning stage for the upcoming tasks.
Included in this gate:
- Points of Contact
- Team member’s responsibility
- Project timeline
- Detailed analysis of the product.
Gate 2
Gate 2 involves the dissection of the product. Included in this gate:
- Disassembly Table
- Subsystem analysis
- Four factors’ influence
