Group 20 - Black and Decker Jigsaw JS510G
From GICLWiki
(Difference between revisions)
(→Gate 3) |
(→Gate 4) |
||
| Line 41: | Line 41: | ||
=Gate 4= | =Gate 4= | ||
| + | |||
| + | Gate 4 includes the reassembly of the product. | ||
| + | |||
| + | Included in this gate: | ||
| + | *Reassembly Table | ||
| + | *Comparison to the Disassembly | ||
| + | *System Level design revisions | ||
| + | |||
[[Group_20_-_Black_and_Decker_Jig_Saw-Gate_4|Gate 4]] | [[Group_20_-_Black_and_Decker_Jig_Saw-Gate_4|Gate 4]] | ||
Revision as of 14:37, 14 December 2011
Contents |
Overview
Gate 1
Gate 1 documents the planning stage for the upcoming tasks.
Included in this gate:
- Points of Contact
- Team member’s responsibility
- Project timeline
- Detailed analysis of the product.
Gate 2
Gate 2 involves the dissection of the product.
Included in this gate:
- Disassembly Table
- Subsystem analysis
- Four factors’ influence
Gate 3
The purpose of Gate 3 is a detailed analysis at the component and subsystem level.
Included in this gate:
- Component Summary
- Product Analysis
- Solid Modeling Assembly
- Manufacturing processes
- Design revisions
Gate 4
Gate 4 includes the reassembly of the product.
Included in this gate:
- Reassembly Table
- Comparison to the Disassembly
- System Level design revisions