Group 18 - Barbie™ Ford Mustang
From GICLWiki
(Difference between revisions)
(→Gate 3: Coordination Review) |
(→Gate 3: Coordination Review) |
||
| Line 21: | Line 21: | ||
==Gate 3: Coordination Review== | ==Gate 3: Coordination Review== | ||
The below link navigates to the <u>Gate 3: Coordination Review</u> page which outlines: | The below link navigates to the <u>Gate 3: Coordination Review</u> page which outlines: | ||
| − | <blockquote | + | <blockquote> |
Cause For Corrective Action<br> | Cause For Corrective Action<br> | ||
Component Summary<br> | Component Summary<br> | ||
Revision as of 01:12, 16 November 2010
Please note: Until the specified due date for each gate, the contents of that gate and all following gates should be considered a rough draft.
Contents |
Gate 1: Request For Proposal
The link below navigates to the Gate 1: Request For Proposal page which outlines:
Group Members' Skills
Management Proposal
Work Proposal
Gate 2: Preliminary Design Review
The link below navigates to the Gate 2: Preliminary Design Review page which outlines:
Preliminary Project Review
Project Dissection
List of Subsystems and Their Connections
Gate 3: Coordination Review
The below link navigates to the Gate 3: Coordination Review page which outlines:
Cause For Corrective Action
Component Summary
Design Revisions
Solid Modeled Assembly
Engineering Analysis
Gate 4: Critical Design Review
The below link navigates to the Gate 4: Critical Design Review page which outlines:
Gate 4 Purpose
Product Reassembly Plan
Post-Reassembly Analysis