Group 18 - Barbie™ Ford Mustang
From GICLWiki
(Difference between revisions)
(→Gate 2: Preliminary Design Review) |
(→Gate 2: Preliminary Design Review) |
||
| Line 13: | Line 13: | ||
==Gate 2: Preliminary Design Review== | ==Gate 2: Preliminary Design Review== | ||
The link below navigates to the <u>Gate 2: Preliminary Design Review</u> page which outlines: | The link below navigates to the <u>Gate 2: Preliminary Design Review</u> page which outlines: | ||
| − | <blockquote> | + | <blockquote> Preliminary Project Review<br> |
| − | + | Project Dissection<br> | |
| − | + | List of Subsystems and Their Connections<br> | |
| − | + | </blockquote> | |
| − | + | ||
[http://gicl.cs.drexel.edu/wiki/Group_18_-_Barbie%E2%84%A2_Ford_Mustang/Gate_2 Gate 2] | [http://gicl.cs.drexel.edu/wiki/Group_18_-_Barbie%E2%84%A2_Ford_Mustang/Gate_2 Gate 2] | ||
Revision as of 10:22, 27 October 2010
Please note: Until the specified due date for each gate, the contents of that gate and all following gates should be considered a rough draft.
Contents |
Gate 1: Request For Proposal
The link below navigates to the Gate 1: Request For Proposal page which outlines:
Group Members' Skills
Management Proposal
Work Proposal
Gate 2: Preliminary Design Review
The link below navigates to the Gate 2: Preliminary Design Review page which outlines:
Preliminary Project Review
Project Dissection
List of Subsystems and Their Connections
Gate 3: Coordination Review
The below link navigates to the Gate 3: Coordination Review page which outlines:
Gate 3 Purpose
Cause For Corrective Action
Component Summary
Design Revisions
Solid Modeled Assembly
Engineering Analysis
Gate 4: Critical Design Review
The below link navigates to the Gate 4: Critical Design Review page which outlines:
Gate 4 Purpose
Product Reassembly Plan
Post-Reassembly Analysis