Group 18 - Barbie™ Ford Mustang
From GICLWiki
(Difference between revisions)
(→Gate 2: Preliminary Design Review) |
(→Gate 1: Request For Proposal) |
||
| Line 5: | Line 5: | ||
<br> | <br> | ||
==Gate 1: Request For Proposal== | ==Gate 1: Request For Proposal== | ||
| − | The | + | The link below navigates to the <u>Gate 1: Request For Proposal</u> page which outlines: |
<blockquote>Group Members' Skills<br> | <blockquote>Group Members' Skills<br> | ||
Management Proposal<br> | Management Proposal<br> | ||
Revision as of 17:48, 20 October 2010
Please note: Until the specified due date for each gate, the contents of that gate and all following gates should be considered a rough draft.
Contents |
Gate 1: Request For Proposal
The link below navigates to the Gate 1: Request For Proposal page which outlines:
Group Members' Skills
Management Proposal
Work Proposal
Gate 2: Preliminary Design Review
The below link navigates to the Gate 2: Preliminary Design Review page which outlines:
Gate 2 Purpose
Cause For Corrective Action
Parts List
Product Dissection Plan
Post-Dissection Analysis
Gate 3: Coordination Review
The below link navigates to the Gate 3: Coordination Review page which outlines:
Gate 3 Purpose
Cause For Corrective Action
Component Summary
Design Revisions
Solid Modeled Assembly
Engineering Analysis
Gate 4: Critical Design Review
The below link navigates to the Gate 4: Critical Design Review page which outlines:
Gate 4 Purpose
Product Reassembly Plan
Post-Reassembly Analysis