Until the specified due date for each gate, the contents of that gate and all following gates should be considered a rough draft.''' | Until the specified due date for each gate, the contents of that gate and all following gates should be considered a rough draft.''' | ||
| − | + | {{Infobox | |
| + | | image =[[File:Barbie-power-wheels-mustang.jpg]] | ||
| + | }} | ||
<br> | <br> | ||
==Gate 1: Request For Proposal== | ==Gate 1: Request For Proposal== | ||
Revision as of 13:56, 29 September 2010
Please note: Until the specified due date for each gate, the contents of that gate and all following gates should be considered a rough draft.
[[Image: |125px|]] | |
Contents |
Gate 1: Request For Proposal
The below link navigates to the Gate 1: Request For Proposal page which outlines:
Group Members' Skills
Management Proposal
Work Proposal
Gate 2: Preliminary Design Review
The below link navigates to the Gate 2: Preliminary Design Review page which outlines:
Gate 2 Purpose
Cause For Corrective Action
Parts List
Product Dissection Plan
Post-Dissection Analysis
Gate 3: Coordination Review
The below link navigates to the Gate 3: Coordination Review page which outlines:
Gate 3 Purpose
Cause For Corrective Action
Component Summary
Design Revisions
Solid Modeled Assembly
Engineering Analysis
Gate 4: Critical Design Review
The below link navigates to the Gate 4: Critical Design Review page which outlines:
Gate 4 Purpose
Product Reassembly Plan