Group 18 - Barbie™ Ford Mustang
From GICLWiki
(Difference between revisions)
(→Gate 1: Request For Proposal) |
(→Gate 1: Request For Proposal) |
||
| Line 9: | Line 9: | ||
Work Proposal</blockquote> | Work Proposal</blockquote> | ||
[http://gicl.cs.drexel.edu/wiki-data/index.php?title=Group_18_-_Barbie™_Ford_Mustang/Gate_1 Gate 1] | [http://gicl.cs.drexel.edu/wiki-data/index.php?title=Group_18_-_Barbie™_Ford_Mustang/Gate_1 Gate 1] | ||
| − | |||
==Gate 2: Preliminary Design Review== | ==Gate 2: Preliminary Design Review== | ||
Revision as of 13:07, 29 September 2010
== Please note: Until the specified due date for each gate, the contents of that gate and all following gates should be considered a rough draft. ==
Contents |
Gate 1: Request For Proposal
The below link navigates to the Gate 1: Request For Proposal page which outlines:
Group Members' Skills
Management Proposal
Work Proposal
Gate 2: Preliminary Design Review
The below link navigates to the Gate 2: Preliminary Design Review page which outlines:
Gate 2 Purpose
Cause For Corrective Action
Parts List
Product Dissection Plan
Post-Dissection Analysis
Gate 3: Coordination Review
The below link navigates to the Gate 3: Coordination Review page which outlines:
Gate 3 Purpose
Cause For Corrective Action
Component Summary
Design Revisions
Solid Modeled Assembly
Engineering Analysis
Gate 4: Critical Design Review
The below link navigates to the Gate 4: Critical Design Review page which outlines:
Gate 4 Purpose
Product Reassembly Plan
Post-Reassembly Analysis