Group 17 - Beginner Dirt Bike
From GICLWiki
Revision as of 00:00, 14 December 2009 by MAE277 17 09 (Talk | contribs)
Contents |
Introduction
Executive Summary
Gate 1: Request for Proposal
Link to Gate 1: Request For Proposal Page
Included in Gate 1:
- Work Proposal
- Management Proposal
- Initial Product Assessment
Gate 2: Preliminary Project Review
Link to Gate 2: Preliminary Project Review
Included in Gate 2:
- Causes for Corrective Action
- Product Dissection Plan
Gate 3: Coordination Review
Link to Gate 3: Coordination Review
Included in Gate 3:
- Component Summary
- Design Revisions
- Solid Modeled Assembly
- Engineering Analysis
Gate 4: Critical Design Review
Link to Gate 4: Critical Design Review
Included in Gate 4:
- Product Reassembly Plan