Group 15 - Skil 7 1/4 in Circular Saw
From GICLWiki
(Difference between revisions)
(→Gate 1: Project Planning) |
(→Gate 2: Product Dissection) |
||
| Line 30: | Line 30: | ||
== Gate 2: Product Dissection== | == Gate 2: Product Dissection== | ||
| + | |||
| + | Gate 2 includes the physical dissection of the product and an analysis of the subsystems found within the saw. | ||
[[Gate 2 - Group 15 - 2012 | Gate 2]] | [[Gate 2 - Group 15 - 2012 | Gate 2]] | ||
Revision as of 17:41, 8 December 2012
Contents |
Project Gates
Executive Summary
Project Overview
Team Members
- Nicholas Grieco (nlgrieco@buffalo.edu)
- Theodore Nalesnik (trnalesn@buffalo.edu)
- Joshua Beres (jjberes2@buffalo.edu)
- James Pullano (jamespul@buffalo.edu)
- Colin Mutton (colinmut@buffalo.edu)
Gate 1: Project Planning
Gate 1 includes the initial assessment of the product and the group members.
Gate 2: Product Dissection
Gate 2 includes the physical dissection of the product and an analysis of the subsystems found within the saw.
