Group 11 - Dual Stage Snow Thrower (Gasoline Powered)

From GICLWiki
(Difference between revisions)
Jump to: navigation, search
(Abstract)
(Sub-Pages)
Line 19: Line 19:
 
[[Group 11 - Dual Stage Snow Thrower (Gasoline Powered) - Gate 4 | Gate 4]]:
 
[[Group 11 - Dual Stage Snow Thrower (Gasoline Powered) - Gate 4 | Gate 4]]:
 
The process of reassembly and a presentation of possible design improvements to the machine.
 
The process of reassembly and a presentation of possible design improvements to the machine.
 +
 +
[[Group 11 - Dual Stage Snow Thrower (Gasoline Powered) - Gate 5 | Gate 5]]:
 +
The project management delivary and product archaeology

Revision as of 14:48, 14 December 2012

Product Dissection and Analysis of the Toro CCR-2000 Snow Thrower

Abstract

Our group took apart, analyzed, and reassembled the CCR-2000. The goal was to examine the critical systems and components of the machine, and the decisions involved in the manufacturing of the blower.

We split the project into four steps: Planning, Dissection, Analysis, and Reconstruction. The steps are laid out below

Sub-Pages

Gate 1: Basic information regarding group members, the Toro CCR-2000 Snow Blower, developmental history, and the plan for dissection.

Gate 2: A report detailing our dissection process and analysis of the subsystems present in the Snow Blower.

Gate 3: Cataloging of parts and analysis of subsystems and manufacturing decisions.

Gate 4: The process of reassembly and a presentation of possible design improvements to the machine.

Gate 5: The project management delivary and product archaeology