Gate one consisted of our introduction to our group and our product. The deliverables for this gate were the work proposal, the management proposal, and our initial product assessment.
Please see this page for our completed
Gate 1
Deliverables
-Work Proposal
-Management Proposal
-Initial Product Assessment
Gate Two
This Gate consisted of out information that we had gathered after dissecting our product. The deliverables for this gate were a correction of our gate one, based on issues or fault. Also to provide a guide to dissecting out product, the dirt bike.
Please see this page for our completed
Gate 2
Deliverables
-Causes for Corrective Action
-Product Dissection Plan
Gate Three
This Gate consisted of doing analysis on our product. We had to do analysis of a specific system within our product, as well as think about design changes that would improve the function of the bike. We also had to document all of the parts that our product consisted of.
Please see this page for our completed
Gate 3
Deliverables
-Component Summary
-Design Revisions
-Solid Modeled Assembly
-Engineering Analysis
Gate Four
This Gate consisted of our documentation of reassembling the dirt bike. We also had questions that needed to be answered about the difference between dis-assembly and reassembly.
Please see this page for our completed
Gate 4
Deliverables
-Product Reassembly Plan