Purpose Introduction
|
 |
In this stage we reassemble our Bolens snow blower making a detailed list of derection for the reassembly of the snow blower. We then analyzed all the information we gathered to make detailed conclusions about the snow blower and various mechanisms which are part of its overall function. Based upon these conclusions we also devise recomended system level revisions to the snow blowers design to improve its overall functionality.
|
Project Gates
| Product Gate Number
|
'
|
Product Description
|
Link to Page
|
| Gate 1 : Project Planning |
|
This is the planning stage of the project. You will be assessing the project, the product, and your group. The deliverables for this gate are the Work Proposal, Management Proposal, and the Initial Assessment. These are to be submitted in a technical report via the group’s wiki page.
|
|
| Gate 2 : Product Dissection |
 |
With the groundwork of planning the dissection and organizing the team done, you are now ready to begin dissection of the physical product. Following your plan, you are to dissect the product, documenting the steps as you go. Post the dissection procedure and the supporting analysis to your technical report on the wiki.
|
|
| Gate 3 : Product Analysis |
 |
With the product dissected, you can now complete a detailed analysis of it. In this stage you will examine the product at the component and subsystem level, gathering detailed information. Present the information in your technical report on your wiki page.
|
|
| Gate 4 : Product Explanation |
 |
This is the planning stage of the project. You will be assessing the project, the product, and your group. The deliverables for this gate are the Work Proposal, Management Proposal, and the Initial Assessment. These are to be submitted in a technical report via the group’s wiki page.
|
|
| Gate 5 : Delivery |
|
In this stage you must finalize all deliverables. This includes finalizing the technical report and preparing the oral presentation. The final technical report should be published on the wiki; the oral presentation will be given at the scheduled time.
|
|