Gate 3 - Product Analysis (Group 10)
From GICLWiki
(Difference between revisions)
| Line 4: | Line 4: | ||
== Product Archaeology: Product Evaluation == | == Product Archaeology: Product Evaluation == | ||
{|border="1" cellpadding="2" | {|border="1" cellpadding="2" | ||
| − | | align="center" style="background:#f0f0f0;"|''' | + | | align="center" style="background:#f0f0f0;"|'''Product Archaeology:Stage''' |
| − | | align="center" style="background:#f0f0f0;"|''' | + | | align="center" style="background:#f0f0f0;"|'''Stage Description''' |
| − | | align="center" style="background:#f0f0f0;"|''' | + | | align="center" style="background:#f0f0f0;"|'''Link to Page''' |
|- | |- | ||
|'''Component Summary'''|| | |'''Component Summary'''|| | ||
Revision as of 15:19, 15 November 2012
The goal of this gate of the project is to complete a detailed analysis of our Snow Blower. In this stage we examined the product at the component and subsystem level, gathering and analyzing detailed information, past what we did in the previous two gates. This proses entailed the revision of our parts list form gate two to include the manufacturing processes used to create each part as well as applicable part numbers on the parts. Also we analyzed some parts in more depth creating solid models and also suggested design revisions which could be made to our product.
Product Archaeology: Product Evaluation
| Product Archaeology:Stage | Stage Description | Link to Page |
| Component Summary |
|
Less than a minute |
| Product Analysis |
|
Several minutes |
| Solid Modeled Assembly |
|
10-20 minutes |
| Engineering Analysis |
|
20-30 minutes |
| Design Revisions |
|
30 minutes + |