Gate 2 - Product Dissection (Group 10)
| Line 18: | Line 18: | ||
|- | |- | ||
|'''Project Management: Preliminary Project Review'''|| | |'''Project Management: Preliminary Project Review'''|| | ||
| − | Here we provide an assessment of our work and management plans. We explain what | + | Here we provide an assessment of our work and management plans. We explain what steps of the dissection process went well and what didn't go as planned. Also we talk about unresolved challenges and how our group is planning to address these problems in future gates and group work. |
|| | || | ||
*[[Project Management: Preliminary Project Review -(Group 10) (Group 10)|Project Management: Preliminary Project Review -(Group 10)]] | *[[Project Management: Preliminary Project Review -(Group 10) (Group 10)|Project Management: Preliminary Project Review -(Group 10)]] | ||
Revision as of 15:23, 9 December 2012
Back to Group 10 Home Page-Group 10 - Snow Blower (Gasoline Powered)
Gate 2
Product Archaeology: Product Evaluation
| Product Archaeology:Stage | Stage Description | Link to Page |
| Project Management: Preliminary Project Review |
Here we provide an assessment of our work and management plans. We explain what steps of the dissection process went well and what didn't go as planned. Also we talk about unresolved challenges and how our group is planning to address these problems in future gates and group work. |
|
| Product Archaeology: Product Dissection |
Here we provide a step by step process describing how our product was dissected. This includes the tools we used and how each part was removed and also includes challenges we faced during dissection process steps and a description of how they were overcome. Using our outline an individual not familiar with our product should be able to successfully disassemble the snow blower. Consider what information is required to achieve this, and how best to communicate this information. |
|
| Product Archaeology: Subsystem Evaluations | *Subsystem Evaluations -(Group 10) |