Gate 1 - Project Planning (Group 10)

From GICLWiki
(Difference between revisions)
Jump to: navigation, search
 
Line 18: Line 18:
 
|-
 
|-
 
|'''Project Management: Work Proposal'''||
 
|'''Project Management: Work Proposal'''||
Your group needs to provide an overview of how you plan to reverse engineer your product. Propose an approach for disassembly and assembly with specific details on what tools will be required, how long it will take and the challenges you have identified through initial inspection of your product. Be sure to include a summary of the capabilities your group has and the shortcomings you may have. (You will not be penalized for providing an honest evaluation of your abilities, I want you to take time to assess those skills you currently have or may need to develop to be successful).
+
Here our group provides an overview of how we plan to reverse engineer our product. Propose an approach for disassemble and assembly with specific details on what tools will anticipate being required. we also project how long it will take and the challenges we have identified through initial inspection of our product. Here we include a summary of the capabilities our group and the shortcomings we may have.
 
||
 
||
 
*[[Project Management: Work Proposal gate 1 -(Group 10)]]
 
*[[Project Management: Work Proposal gate 1 -(Group 10)]]
 
|-
 
|-
 
|'''Project Management: Management Proposal'''||
 
|'''Project Management: Management Proposal'''||
How does your group plan to manage its work? Provide a point of contact for me to get in touch with your group and outline how often you will meet, where you will meet and at what time. Provide me with a plan that will enable you to meet all the project requirements in the timeline provided. You should also provide roles for your group members, like “Project Manager,” “Technical Expert,” “Communication Liaison” or others that will be needed for success. For each role outline a list of responsibilities. Be sure to address how you will handle group conflicts.
+
Here we provide a point of contact for our professor to get in touch with the group and outline how often we will meet, where we will meet and at what times. we also provide  a plan that will enable us to meet all the project requirements in the timeline provided. This includes roles for our group members.
 
||
 
||
 
*[[Project Management: Management Proposal -(Group 10)]]
 
*[[Project Management: Management Proposal -(Group 10)]]
 
|-
 
|-
 
|'''Product Archaeology'''||
 
|'''Product Archaeology'''||
Complete a thorough analysis of your product without doing any dissection, either physical or virtual; you may not open up your product beyond normal usage or use exploded assembly drawings. Normal usage covers anything a customer would do in using the product, such as changing a filter in a vacuum cleaner or replacing batteries in a toy. The goal of this stage is to familiarize your group with the product and gather the required information to successfully complete the product dissection. Your analysis should at a minimum answer the questions in Table 1. Use photographs, videos, and animations when appropriate.
+
Here we complete a thorough analysis of our product without doing any dissection. The goal of this stage is to familiarize our group with the product and gather the required information to successfully complete the product dissection. our analysis includes answers the questions in Gate 1 Table 1.
 
||
 
||
 
*[['''Product Archaeology''' -(Group 10)]]
 
*[['''Product Archaeology''' -(Group 10)]]
 +
*[['''Gate 1 Table 1''' -(Group 10)]]
 
|
 
|
 
|}
 
|}

Latest revision as of 16:30, 9 December 2012

Back to Group 10 Home Page-Group 10 - Snow Blower (Gasoline Powered)


Course Project Project Introduction Product Introduction Link
Snow blower.jpg This is the planning stage of our the project. The deliverable's for this gate are the Work Proposal, Management Proposal, and the Initial Assessment. Here we outline the future of the course project projecting how we will manege ourselves as a group and finding out out weaknesses and strengths. Project Introduction Outline -(Group 10)


Product Archaeology:Stage Stage Description Link to Page
Project Management: Work Proposal

Here our group provides an overview of how we plan to reverse engineer our product. Propose an approach for disassemble and assembly with specific details on what tools will anticipate being required. we also project how long it will take and the challenges we have identified through initial inspection of our product. Here we include a summary of the capabilities our group and the shortcomings we may have.

Project Management: Management Proposal

Here we provide a point of contact for our professor to get in touch with the group and outline how often we will meet, where we will meet and at what times. we also provide a plan that will enable us to meet all the project requirements in the timeline provided. This includes roles for our group members.

Product Archaeology

Here we complete a thorough analysis of our product without doing any dissection. The goal of this stage is to familiarize our group with the product and gather the required information to successfully complete the product dissection. our analysis includes answers the questions in Gate 1 Table 1.