|'''Project Management: Work Proposal'''||
 
|'''Project Management: Work Proposal'''||
Here we talk about how our group is going to address problems that arrise in this gate. For challenges that have been we describe how our group dealt with the problems.
+
Your group needs to provide an overview of how you plan to reverse engineer your product. Propose an approach for disassembly and assembly with specific details on what tools will be required, how long it will take and the challenges you have identified through initial inspection of your product. Be sure to include a summary of the capabilities your group has and the shortcomings you may have. (You will not be penalized for providing an honest evaluation of your abilities, I want you to take time to assess those skills you currently have or may need to develop to be successful).
 
||
 
||
 
*[[Project Management: Work Proposal gate 1 -(Group 10)]]
 
*[[Project Management: Work Proposal gate 1 -(Group 10)]]
 
|-
 
|-
 
|'''Project Management: Management Proposal'''||
 
|'''Project Management: Management Proposal'''||
Here we provide a step by step process describing how our product was reassembled. Being extremely specific, this description includes the tools used and how they where used. We brefly describe challenges during reassembly in the introduction and throughout the steps utalizing our complexity scale and also outline those challenges and describe how they were overcome. Using our outline an individual not familiar with the product should be able to successfully reassemble our snow blower.
+
How does your group plan to manage its work? Provide a point of contact for me to get in touch with your group and outline how often you will meet, where you will meet and at what time. Provide me with a plan that will enable you to meet all the project requirements in the timeline provided. You should also provide roles for your group members, like “Project Manager,” “Technical Expert,” “Communication Liaison” or others that will be needed for success. For each role outline a list of responsibilities. Be sure to address how you will handle group conflicts.
 
||
 
||
 
[[Project Management: Management Proposal -(Group 10)]]
 
[[Project Management: Management Proposal -(Group 10)]]
 
|-
 
|-
 
|''''''Product Archaeology''''''||
 
|''''''Product Archaeology''''''||
Here our group identifys three mechanisms that our device uses to generate specific motion, control system behavior, modify/condition energy, etc. For these mechanisms we identify their technical name, clearly state their purpose, document how the mechanism works, and provide equations which are required for the design of the mechanism.
+
Complete a thorough analysis of your product without doing any dissection, either physical or virtual; you may not open up your product beyond normal usage or use exploded assembly drawings. Normal usage covers anything a customer would do in using the product, such as changing a filter in a vacuum cleaner or replacing batteries in a toy. The goal of this stage is to familiarize your group with the product and gather the required information to successfully complete the product dissection. Your analysis should at a minimum answer the questions in Table 1. Use photographs, videos, and animations when appropriate.
 
||
 
||
 
*[['''Product Archaeology''' -(Group 10)]]
 
*[['''Product Archaeology''' -(Group 10)]]
 
|-
 
|-
 
|}
 
|}

Revision as of 12:05, 5 December 2012

Gate 1 –Project Planning

Product Archaeology:Stage Stage Description Link to Page
Project Management: Work Proposal

Your group needs to provide an overview of how you plan to reverse engineer your product. Propose an approach for disassembly and assembly with specific details on what tools will be required, how long it will take and the challenges you have identified through initial inspection of your product. Be sure to include a summary of the capabilities your group has and the shortcomings you may have. (You will not be penalized for providing an honest evaluation of your abilities, I want you to take time to assess those skills you currently have or may need to develop to be successful).

Project Management: Management Proposal

How does your group plan to manage its work? Provide a point of contact for me to get in touch with your group and outline how often you will meet, where you will meet and at what time. Provide me with a plan that will enable you to meet all the project requirements in the timeline provided. You should also provide roles for your group members, like “Project Manager,” “Technical Expert,” “Communication Liaison” or others that will be needed for success. For each role outline a list of responsibilities. Be sure to address how you will handle group conflicts.

Project Management: Management Proposal -(Group 10)

'Product Archaeology'

Complete a thorough analysis of your product without doing any dissection, either physical or virtual; you may not open up your product beyond normal usage or use exploded assembly drawings. Normal usage covers anything a customer would do in using the product, such as changing a filter in a vacuum cleaner or replacing batteries in a toy. The goal of this stage is to familiarize your group with the product and gather the required information to successfully complete the product dissection. Your analysis should at a minimum answer the questions in Table 1. Use photographs, videos, and animations when appropriate.