Purpose
In Gate 5, the group is required to make revisions on the gate as recommended.
Finalization of Deliverables
This section lists the revisions made in each gate.
Gate 1
- Overall
- Added references
- Added section about needed skills to be developed
- Fixed redundant opening
- Added figure numbers
- Product Management
- Improved the detail of Gantt Chart
- Improved capability table
- Management Proposal
- Specified who will attend meetings
- Specified purpose of meetings and what is expected to be done
- Included emails for each group member
Gate 2
- Overall
- Added section about parts being intended to be disassembled or not
- Project Management
- Added statements about the efficiency of current plan
- Added statements about current and future challenges
- Product Dissection Plan
- Revised difficulty scale and added explanations
- Product Dissection Assessment
- Documented physical and energy connections of subsystems
- Stated environmental concerns of connections of subsystems
- Stated which subsystems can not be adjacent
Gate 3
- Overall
- Added figure labels
- Improved formatting
- Coordination Review
- Documented the effectiveness of the new time management plan
- Product Analysis
- Noted that plastic is not included in the analysis of the steering column
- Improved difficulty scale
- Engineering analysis
- Documented how gear reduction analysis will be used in designing/testing the product
- Design revisions
- Stated how the the frame will be reinforced in the design revision section
- Added image of the rear axle revision
Gate 4
- Product Archeology
- Measured the difficulty scale on better terms(i.e technical knowledge e.t.c)
- Added Original assembly documentation
- Design Revisions
- Addressed more societal concerns
Oral Presentation
The follow images depicts the presentation used during the groups oral presentation done in class.
- Group 16 Presentation