Difference between revisions of "Group 3 - Kawasaki Compressor 1"

From GICL Wiki
Jump to: navigation, search
Line 4: Line 4:
 
We are a group of five engineering students taking an MAE 277 Intro to M.E. course at University at Buffalo. During the course of the semester, our group will be analyzing, dissecting, documenting, and reassembling a Kawasaki Air Compressor. We hope to not only gain knowledge of the product at hand, but also learn how to plan according and work as a team to build and analyze a detailed report about our subject.
 
We are a group of five engineering students taking an MAE 277 Intro to M.E. course at University at Buffalo. During the course of the semester, our group will be analyzing, dissecting, documenting, and reassembling a Kawasaki Air Compressor. We hope to not only gain knowledge of the product at hand, but also learn how to plan according and work as a team to build and analyze a detailed report about our subject.
  
==Group members==
+
==<b>Group members</b>==
 
*'''Bob Neuman''': rmneuman@buffalo.edu<br>
 
*'''Bob Neuman''': rmneuman@buffalo.edu<br>
 
*'''Brian Webb''': brianweb@buffalo.edu<br>
 
*'''Brian Webb''': brianweb@buffalo.edu<br>
Line 11: Line 11:
 
*'''Joe Bruzgul''': jpbruzgu@buffalo.edu<br>
 
*'''Joe Bruzgul''': jpbruzgu@buffalo.edu<br>
  
==Gate 1==
+
==<b>Gate 1</b>==
 
Here is a link to Gate 1 of our project outlining:<br>
 
Here is a link to Gate 1 of our project outlining:<br>
 
<blockquote>
 
<blockquote>
Line 20: Line 20:
 
[[Group 3 - Kawasaki Compressor - Gate 1|Gate 1 of Kawasaki Compressor Project]]
 
[[Group 3 - Kawasaki Compressor - Gate 1|Gate 1 of Kawasaki Compressor Project]]
  
==Gate 2==
+
==<b>Gate 2</b>==
 
Here is a link to Gate 2 of our project<br>
 
Here is a link to Gate 2 of our project<br>
 
[[Group 3 - Kawasaki Compressor - Gate 2|Gate 2]]
 
[[Group 3 - Kawasaki Compressor - Gate 2|Gate 2]]
  
==Gate 3==
+
==<b>Gate 3</b>==
 
Here is a link to Gate 3 of our project<br>
 
Here is a link to Gate 3 of our project<br>
 
[[Group 3 - Kawasaki Compressor - Gate 3|Gate 3]]
 
[[Group 3 - Kawasaki Compressor - Gate 3|Gate 3]]
  
==Gate 4==
+
==<b>Gate 4</b>==
 
Here is a link to Gate 4 of our project<br>
 
Here is a link to Gate 4 of our project<br>
 
[[Group 3 - Kawasaki Compressor - Gate 4|Gate 4]]
 
[[Group 3 - Kawasaki Compressor - Gate 4|Gate 4]]

Revision as of 20:47, 30 September 2010

Kawasaki Compressor [1]

Contents

Introduction

We are a group of five engineering students taking an MAE 277 Intro to M.E. course at University at Buffalo. During the course of the semester, our group will be analyzing, dissecting, documenting, and reassembling a Kawasaki Air Compressor. We hope to not only gain knowledge of the product at hand, but also learn how to plan according and work as a team to build and analyze a detailed report about our subject.

Group members

  • Bob Neuman: rmneuman@buffalo.edu
  • Brian Webb: brianweb@buffalo.edu
  • Tyler Morris: tylermor@buffalo.edu
  • Will Sassenhausen: wtsassen@buffalo.edu
  • Joe Bruzgul: jpbruzgu@buffalo.edu

Gate 1

Here is a link to Gate 1 of our project outlining:

  • Group Member Background
  • Proposed Time Management Analysis
  • Group Analysis
  • Pre-Dissection Analysis
Gate 1 of Kawasaki Compressor Project

Gate 2

Here is a link to Gate 2 of our project
Gate 2

Gate 3

Here is a link to Gate 3 of our project
Gate 3

Gate 4

Here is a link to Gate 4 of our project
Gate 4


References

[1]. Kawasaki 8 Gallon Air Compressor with Nailer and Muffle. (n.d.). Used Calgary. Retrieved September 29, 2010, from http://www.usedcalgary.com/classified-ad/Kawasaki-8-Gallon-Air-Compressor-with-Nailer-and-Muffle_12716911