Difference between revisions of "Group 29 - Homelite Line Trimmer"

From GICL Wiki
Jump to: navigation, search
Line 3: Line 3:
 
[[image:full.jpg|thumb|right|Homelite Versatool Line Trimmer.  Click to view a higher resolution of the image.|300px]]  
 
[[image:full.jpg|thumb|right|Homelite Versatool Line Trimmer.  Click to view a higher resolution of the image.|300px]]  
 
[[image:weedwackerimage.jpg|thumb|right|A more recent model of the Homelite Versatool Line Trimmer|300px]]  
 
[[image:weedwackerimage.jpg|thumb|right|A more recent model of the Homelite Versatool Line Trimmer|300px]]  
<br>
+
<br><br>
 
== Gate I: Request for Proposal ==
 
== Gate I: Request for Proposal ==
 
Below are arranged, in sequence, links to the subsections constituting the '''Request for Proposal'''.  
 
Below are arranged, in sequence, links to the subsections constituting the '''Request for Proposal'''.  
Line 11: Line 11:
  
 
<br>
 
<br>
 +
<u>Date Submitted:</u> October 10, 2009
 +
 +
<br><br>
 
== Gate II: Preliminary Project Review ==
 
== Gate II: Preliminary Project Review ==
 
The following links entail the ''Causes for Corrective Action'' and the ''Product Dissection Plan'' of the '''Preliminary Project Review'''.
 
The following links entail the ''Causes for Corrective Action'' and the ''Product Dissection Plan'' of the '''Preliminary Project Review'''.
 
=== [[Link: Causes for Corrective Action]] ===
 
=== [[Link: Causes for Corrective Action]] ===
 
=== [[Link: Product Dissection Plan]] ===
 
=== [[Link: Product Dissection Plan]] ===
 
  
 
<br>
 
<br>
 +
<u>Date Submitted:</u> October 30, 2009
 +
 +
<br><br>
 
== Gate III: Coordination Review ==
 
== Gate III: Coordination Review ==
  
Line 26: Line 31:
 
=== [[Link: Solid Modeled Assembly]] ===
 
=== [[Link: Solid Modeled Assembly]] ===
 
=== [[Link: Engineering Analysis]] ===
 
=== [[Link: Engineering Analysis]] ===
 
  
 
<br>
 
<br>
 +
<u>Date Submitted:</u> November 30, 2009
 +
 +
<br><br>
 
== Gate IV: Critical Project Review ==
 
== Gate IV: Critical Project Review ==
  

Revision as of 08:56, 3 December 2009

Note: For optimal viewing of the content on this page, please maximize the size of the window of your given internet browser.

Homelite Versatool Line Trimmer. Click to view a higher resolution of the image.
A more recent model of the Homelite Versatool Line Trimmer



Contents

Gate I: Request for Proposal

Below are arranged, in sequence, links to the subsections constituting the Request for Proposal.

Link: Work Proposal

Link: Management Proposal

Link: Initial Product Assessment


Date Submitted: October 10, 2009



Gate II: Preliminary Project Review

The following links entail the Causes for Corrective Action and the Product Dissection Plan of the Preliminary Project Review.

Link: Causes for Corrective Action

Link: Product Dissection Plan


Date Submitted: October 30, 2009



Gate III: Coordination Review

The links below lead to the subsections (Component Summary, Design Revisions, Solid Modeled Assembly, and Engineering Analysis, respectively) comprising the Coordination Review. Access to the subsection References to Supplementary Material is provided in the Engineering Analysis, the content of which corresponds with the noted references to outside literature and kindred online sources of the former.

Link: Component Summary

Link: Design Revisions

Link: Solid Modeled Assembly

Link: Engineering Analysis


Date Submitted: November 30, 2009



Gate IV: Critical Project Review

The following links to the Product Reassembly Plan constituting the Critical Project Review.

Link: Product Reassembly Plan