=Final Report=
 +
[[Group_20_-_Black_and_Decker_Jigsaw_Final_Report|Final Report]]
  
 
= Gate 1 =
 
= Gate 1 =

Revision as of 14:30, 14 December 2011

Contents

Overview

Imange 1: Black and Decker Jig Saw, Click to View

Final Report

Final Report

Gate 1

Gate 1 documents the planning stage for the upcoming tasks.

Included in this gate:

  • Points of Contact
  • Team member’s responsibility
  • Project timeline
  • Detailed analysis of the product.

Gate 1

Gate 2

Gate 2 involves the dissection of the product.

Included in this gate:

  • Disassembly Table
  • Subsystem analysis
  • Four factors’ influence

Gate 2

Gate 3

The purpose of Gate 3 is a detailed analysis at the component and subsystem level.

Included in this gate:

  • Component Summary
  • Product Analysis
  • Solid Modeling Assembly
  • Manufacturing processes
  • Design revisions


Gate 3

Gate 4

Gate 4 includes the reassembly of the product.

Included in this gate:

  • Reassembly Table
  • Comparison to the Disassembly
  • System Level design revisions


Gate 4