Difference between revisions of "Group 20 - Black and Decker Jigsaw JS510G"

From GICL Wiki
Jump to: navigation, search
(Overview)
(Gate 1)
Line 4: Line 4:
  
 
= Gate 1 =
 
= Gate 1 =
 +
 +
Gate 1 documents the planning stage for the upcoming tasks.
 +
Included in this gate are:
 +
*Points of Contact
 +
*Team member’s responsibility
 +
*Project timeline
 +
*Detailed analysis of the product.
  
 
[[Group_20_-_Black_and_Decker_Jig_Saw-Gate_1|Gate 1]]
 
[[Group_20_-_Black_and_Decker_Jig_Saw-Gate_1|Gate 1]]

Revision as of 14:27, 14 December 2011

Contents

Overview

Imange 1: Black and Decker Jig Saw, Click to View

Gate 1

Gate 1 documents the planning stage for the upcoming tasks. Included in this gate are:

  • Points of Contact
  • Team member’s responsibility
  • Project timeline
  • Detailed analysis of the product.

Gate 1

Gate 2

Gate 2

Gate 3

Gate 3

Gate 4

Gate 4