Group 18 - Barbie™ Ford Mustang

From GICL Wiki
Revision as of 12:07, 29 September 2010 by MAE 277 2010 Group 18 (Talk | contribs)

Jump to: navigation, search

== Please note: Until the specified due date for each gate, the contents of that gate and all following gates should be considered a rough draft. ==


Contents

Gate 1: Request For Proposal

The below link navigates to the Gate 1: Request For Proposal page which outlines:

Group Members' Skills
Management Proposal
Work Proposal

Gate 1

Gate 2: Preliminary Design Review

The below link navigates to the Gate 2: Preliminary Design Review page which outlines:

Gate 2 Purpose
Cause For Corrective Action
Parts List
Product Dissection Plan
Post-Dissection Analysis


Gate 3: Coordination Review

The below link navigates to the Gate 3: Coordination Review page which outlines:

Gate 3 Purpose
Cause For Corrective Action
Component Summary
Design Revisions
Solid Modeled Assembly
Engineering Analysis


Gate 4: Critical Design Review

The below link navigates to the Gate 4: Critical Design Review page which outlines:

Gate 4 Purpose
Product Reassembly Plan
Post-Reassembly Analysis