Difference between revisions of "Group 18 - Barbie™ Ford Mustang"

From GICL Wiki
Jump to: navigation, search
(Gate 1: Request For Proposal)
(Gate 2: Preliminary Design Review)
Line 12: Line 12:
  
 
==Gate 2: Preliminary Design Review==
 
==Gate 2: Preliminary Design Review==
The below link navigates to the <u>Gate 2: Preliminary Design Review</u> page which outlines:
+
The link below navigates to the <u>Gate 2: Preliminary Design Review</u> page which outlines:
 
<blockquote> Gate 2 Purpose<br>
 
<blockquote> Gate 2 Purpose<br>
 
Cause For Corrective Action<br>
 
Cause For Corrective Action<br>

Revision as of 16:48, 20 October 2010

Please note: Until the specified due date for each gate, the contents of that gate and all following gates should be considered a rough draft.

Fisher Price Power Wheels Barbie Mustang


Contents

Gate 1: Request For Proposal

The link below navigates to the Gate 1: Request For Proposal page which outlines:

Group Members' Skills
Management Proposal
Work Proposal

Gate 1

Gate 2: Preliminary Design Review

The link below navigates to the Gate 2: Preliminary Design Review page which outlines:

Gate 2 Purpose
Cause For Corrective Action
Parts List
Product Dissection Plan
Post-Dissection Analysis

Gate 2

Gate 3: Coordination Review

The below link navigates to the Gate 3: Coordination Review page which outlines:

Gate 3 Purpose
Cause For Corrective Action
Component Summary
Design Revisions
Solid Modeled Assembly
Engineering Analysis


Gate 4: Critical Design Review

The below link navigates to the Gate 4: Critical Design Review page which outlines:

Gate 4 Purpose
Product Reassembly Plan
Post-Reassembly Analysis