Difference between revisions of "Group 18 - Barbie™ Ford Mustang"

From GICL Wiki
Jump to: navigation, search
(Gate 1: Request For Proposal)
Line 9: Line 9:
 
Work Proposal</blockquote>
 
Work Proposal</blockquote>
 
[http://gicl.cs.drexel.edu/wiki-data/index.php?title=Group_18_-_Barbie™_Ford_Mustang/Gate_1 Gate 1]
 
[http://gicl.cs.drexel.edu/wiki-data/index.php?title=Group_18_-_Barbie™_Ford_Mustang/Gate_1 Gate 1]
 +
                                            [[File:barbie-power-wheels-mustang.jpg]]
  
 
==Gate 2: Preliminary Design Review==
 
==Gate 2: Preliminary Design Review==

Revision as of 18:23, 28 September 2010

== Please note: Until the specified due date for each gate, the contents of that gate and all following gates should be considered a rough draft. ==


Contents

Gate 1: Request For Proposal

The below link navigates to the Gate 1: Request For Proposal page which outlines:

Group Members' Skills
Management Proposal
Work Proposal

Gate 1

                                            Barbie-power-wheels-mustang.jpg

Gate 2: Preliminary Design Review

The below link navigates to the Gate 2: Preliminary Design Review page which outlines:

Gate 2 Purpose
Cause For Corrective Action
Parts List
Product Dissection Plan
Post-Dissection Analysis


Gate 3: Coordination Review

The below link navigates to the Gate 3: Coordination Review page which outlines:

Gate 3 Purpose
Cause For Corrective Action
Component Summary
Design Revisions
Solid Modeled Assembly
Engineering Analysis


Gate 4: Critical Design Review

The below link navigates to the Gate 4: Critical Design Review page which outlines:

Gate 4 Purpose
Product Reassembly Plan
Post-Reassembly Analysis