Difference between revisions of "Group 18 - Barbie™ Ford Mustang"

From GICL Wiki
Jump to: navigation, search
(Created page with 'This is the temporary Wiki page for MAE 277 Group #18 Project. More information will be added as appropriate.')
 
Line 1: Line 1:
This is the temporary Wiki page for MAE 277 Group #18 Project.
+
==Gate 1: Request For Proposal==
 +
The below link navigates to the <u>Gate 1: Request For Proposal</u> page which outlines:
 +
<blockquote>Group Members' Skills<br>
 +
Management Proposal<br>
 +
Work Proposal</blockquote>
  
More information will be added as appropriate.
+
 
 +
==Gate 2: Preliminary Design Review==
 +
The below link navigates to the <u>Gate 2: Preliminary Design Review</u> page which outlines:
 +
<blockquote> Gate 2 Purpose<br>
 +
Cause For Corrective Action<br>
 +
Parts List<br>
 +
Product Dissection Plan<br>
 +
Post-Dissection Analysis</blockquote>
 +
 
 +
 
 +
==Gate 3: Coordination Review==
 +
The below link navigates to the <u>Gate 3: Coordination Review</u> page which outlines:
 +
<blockquote> Gate 3 Purpose<br>
 +
Cause For Corrective Action<br>
 +
Component Summary<br>
 +
Design Revisions<br>
 +
Solid Modeled Assembly<br>
 +
Engineering Analysis</blockquote>
 +
 
 +
 
 +
==Gate 4: Critical Design Review==
 +
The below link navigates to the <u>Gate 4: Critical Design Review</u> page which outlines:
 +
<blockquote> Gate 4 Purpose<br>
 +
Product Reassembly Plan<br>
 +
Post-Reassembly Analysis</blockquote>

Revision as of 20:34, 27 September 2010

Contents

Gate 1: Request For Proposal

The below link navigates to the Gate 1: Request For Proposal page which outlines:

Group Members' Skills
Management Proposal
Work Proposal


Gate 2: Preliminary Design Review

The below link navigates to the Gate 2: Preliminary Design Review page which outlines:

Gate 2 Purpose
Cause For Corrective Action
Parts List
Product Dissection Plan
Post-Dissection Analysis


Gate 3: Coordination Review

The below link navigates to the Gate 3: Coordination Review page which outlines:

Gate 3 Purpose
Cause For Corrective Action
Component Summary
Design Revisions
Solid Modeled Assembly
Engineering Analysis


Gate 4: Critical Design Review

The below link navigates to the Gate 4: Critical Design Review page which outlines:

Gate 4 Purpose
Product Reassembly Plan
Post-Reassembly Analysis