Difference between revisions of "Group 18 - Barbie™ Ford Mustang"

From GICL Wiki
Jump to: navigation, search
(Summary of Project)
 
(6 intermediate revisions by one user not shown)
Line 4: Line 4:
 
Each of the gates focused on a specific step of examining the car in detail.<br/><br>
 
Each of the gates focused on a specific step of examining the car in detail.<br/><br>
 
'''Gate 1:''' Project planning <br/>
 
'''Gate 1:''' Project planning <br/>
 +
<blockquote>·Plan for disassemble<br/>
 +
·Group member's duty<br/></blockquote>
 
'''Gate 2:''' Project dissection <br/>
 
'''Gate 2:''' Project dissection <br/>
 +
<blockquote>·Table of disassemble<br/>
 +
·Subsystems and their connections<br/></blockquote>
 
'''Gate 3:''' Product Analysis <br/>
 
'''Gate 3:''' Product Analysis <br/>
'''Gate 4:''' Product Assembly
+
<blockquote>·Component Summary<br/>
 +
·Design Revisions<br/>
 +
·Solid Modeled Assembly<br/>
 +
·Engineering Analysis<br/></blockquote>
 +
'''Gate 4:''' Product Assembly  
 +
<blockquote>·Product Reassembly Plan<br/>
 +
·Post-Reassembly Analysis<br/> </blockquote>
 
[[File:Barbie-power-wheels-mustang.jpg|right|Fisher Price Power Wheels Barbie Mustang]]
 
[[File:Barbie-power-wheels-mustang.jpg|right|Fisher Price Power Wheels Barbie Mustang]]
  
Line 42: Line 52:
 
Post-Reassembly Analysis</blockquote>
 
Post-Reassembly Analysis</blockquote>
 
[http://gicl.cs.drexel.edu/wiki/Group_18_-_Barbie%E2%84%A2_Ford_Mustang/Gate_4 Gate 4]
 
[http://gicl.cs.drexel.edu/wiki/Group_18_-_Barbie%E2%84%A2_Ford_Mustang/Gate_4 Gate 4]
 +
 +
==Gate 5: Delivery==
 +
The below link navigates to the <u>Gate 4: Critical Design Review</u> page which outlines:
 +
<blockquote> Finalization of Deliverables<br>
 +
Corrections of Past Gates<br>
 +
</blockquote>
 +
[http://gicl.cs.drexel.edu/wiki/Group_18_-_Barbie%E2%84%A2_Ford_Mustang/Gate_5 Gate 5]

Latest revision as of 15:33, 15 December 2010

Contents

Summary of Project

Our project for MAE 277 was the Ford Barbie Mustang. It was designed in 2007 and production for it began in 2009. Its intended customer is focused at the parents buying the car for their daughter age 3-10. The actual car works off of two small electrical motors which receive their power from a 12 v Lead Acid battery. The car operates on three different speeds including reverse, forward at 2.5 mph, and forward at 5mph. The actual signal controls for their car are rather simplistic and work off of human energy of turning the wheel to steer the car and change the shifter to control speed. The rest of the signals are controlled from the accelerator switch being activated by human input. This sends a signal to the battery to release electrical energy to the motor where the energy is transformed to rotational mechanical energy of the wheel. The car mostly consists of varying types of plastics including Polypropylene for the outside body and ABS plastic for the tires. Virtually all of these parts were made through injection molding. The actual disassemble and assembly require little technical skills and tools. The whole car can be taken apart with a Phillips head screwdriver and hammer.

Each of the gates focused on a specific step of examining the car in detail.

Gate 1: Project planning

·Plan for disassemble
·Group member's duty

Gate 2: Project dissection

·Table of disassemble
·Subsystems and their connections

Gate 3: Product Analysis

·Component Summary
·Design Revisions
·Solid Modeled Assembly
·Engineering Analysis

Gate 4: Product Assembly

·Product Reassembly Plan
·Post-Reassembly Analysis
Fisher Price Power Wheels Barbie Mustang


Gate 1: Request For Proposal

The link below navigates to the Gate 1: Request For Proposal page which outlines:

Group Members' Skills
Management Proposal
Work Proposal

Gate 1

Gate 2: Preliminary Design Review

The link below navigates to the Gate 2: Preliminary Design Review page which outlines:

Preliminary Project Review
Project Dissection
List of Subsystems and Their Connections

Gate 2

Gate 3: Coordination Review

The below link navigates to the Gate 3: Coordination Review page which outlines:

Cause For Corrective Action
Component Summary
Design Revisions
Solid Modeled Assembly
Engineering Analysis

Gate 3

Gate 4: Critical Design Review

The below link navigates to the Gate 4: Critical Design Review page which outlines:

Gate 4 Purpose
Product Reassembly Plan
Post-Reassembly Analysis

Gate 4

Gate 5: Delivery

The below link navigates to the Gate 4: Critical Design Review page which outlines:

Finalization of Deliverables
Corrections of Past Gates

Gate 5