Difference between revisions of "Group 11 - Beginner Dirt Bike"

From GICL Wiki
Jump to: navigation, search
Line 10: Line 10:
  
 
Gate one consisted of our introduction to our group and our product. The deliverables for this gate were the work proposal, the management proposal, and our initial product assessment.
 
Gate one consisted of our introduction to our group and our product. The deliverables for this gate were the work proposal, the management proposal, and our initial product assessment.
 +
  
 
Please see this page for our completed  
 
Please see this page for our completed  
 
[[Group 11 - Gate 1|Gate 1]]
 
[[Group 11 - Gate 1|Gate 1]]
 +
 +
 +
'''Deliverables'''
 +
 +
-Work Proposal
 +
 +
-Management Proposal
 +
 +
-Initial Product Assessment
 +
  
  
Line 18: Line 29:
  
 
This Gate consisted of out information that we had gathered after dissecting our product. The deliverables for this gate were a correction of our gate one, based on issues or fault. Also to provide a guide to dissecting out product, the dirt bike.  
 
This Gate consisted of out information that we had gathered after dissecting our product. The deliverables for this gate were a correction of our gate one, based on issues or fault. Also to provide a guide to dissecting out product, the dirt bike.  
 +
  
 
Please see this page for our completed
 
Please see this page for our completed
 
[[Group 11 - Gate 2| Gate 2]]
 
[[Group 11 - Gate 2| Gate 2]]
 +
 +
 +
'''Deliverables'''
 +
 +
-Causes for Corrective Action
 +
 +
-Product Dissection Plan
  
  
Line 26: Line 45:
  
 
This Gate consisted of doing analysis on our product. We had to do analysis of a specific system within our product, as well as think about design changes that would improve the function of the bike. We also had to document all of the parts that our product consisted of.  
 
This Gate consisted of doing analysis on our product. We had to do analysis of a specific system within our product, as well as think about design changes that would improve the function of the bike. We also had to document all of the parts that our product consisted of.  
 +
  
 
Please see this page for our completed
 
Please see this page for our completed
 
[[Group 11 - gate 3|Gate 3]]
 
[[Group 11 - gate 3|Gate 3]]
  
 +
 +
'''Deliverables'''
 +
 +
-Component Summary
 +
 +
-Design Revisions
 +
 +
-Solid Modeled Assembly
 +
 +
-Engineering Analysis
  
  
Line 35: Line 65:
  
 
This Gate consisted of our documentation of reassembling the dirt bike. We also had questions that needed to be answered about the difference between dis-assembly and reassembly.  
 
This Gate consisted of our documentation of reassembling the dirt bike. We also had questions that needed to be answered about the difference between dis-assembly and reassembly.  
 +
  
 
Please see this page for our completed
 
Please see this page for our completed
 
[[Group 11 - gate 4|Gate 4]]
 
[[Group 11 - gate 4|Gate 4]]
 +
 +
 +
 +
'''Deliverables'''
 +
 +
-Product Reassembly Plan

Revision as of 13:10, 16 December 2009

Contents

Wikipedia Encyclopedia



Gate One

Gate one consisted of our introduction to our group and our product. The deliverables for this gate were the work proposal, the management proposal, and our initial product assessment.


Please see this page for our completed Gate 1


Deliverables

-Work Proposal

-Management Proposal

-Initial Product Assessment


Gate Two

This Gate consisted of out information that we had gathered after dissecting our product. The deliverables for this gate were a correction of our gate one, based on issues or fault. Also to provide a guide to dissecting out product, the dirt bike.


Please see this page for our completed Gate 2


Deliverables

-Causes for Corrective Action

-Product Dissection Plan


Gate Three

This Gate consisted of doing analysis on our product. We had to do analysis of a specific system within our product, as well as think about design changes that would improve the function of the bike. We also had to document all of the parts that our product consisted of.


Please see this page for our completed Gate 3


Deliverables

-Component Summary

-Design Revisions

-Solid Modeled Assembly

-Engineering Analysis


Gate Four

This Gate consisted of our documentation of reassembling the dirt bike. We also had questions that needed to be answered about the difference between dis-assembly and reassembly.


Please see this page for our completed Gate 4


Deliverables

-Product Reassembly Plan