Difference between revisions of "Group 10 - Snow Blower (Gasoline Powered)"

From GICL Wiki
Jump to: navigation, search
Line 7: Line 7:
 
|}
 
|}
  
[[File:Snow blower.jpg|300px]]
 
  
  

Revision as of 11:39, 5 December 2012

Gate 4-Product Explanation Purpose Introduction
Snow blower.jpg In this stage we reassemble our Bolens snow blower making a detailed list of derection for the reassembly of the snow blower. We then analyzed all the information we gathered to make detailed conclusions about the snow blower and various mechanisms which are part of its overall function. Based upon these conclusions we also devise recomended system level revisions to the snow blowers design to improve its overall functionality.


Project Gates

Product Gate Number ' Product Description Link to Page
Gate 1 : Project Planning

This is the planning stage of the project. You will be assessing the project, the product, and your group. The deliverables for this gate are the Work Proposal, Management Proposal, and the Initial Assessment. These are to be submitted in a technical report via the group’s wiki page.

Gate 2 : Product Dissection Part 9999 group 10.png

With the groundwork of planning the dissection and organizing the team done, you are now ready to begin dissection of the physical product. Following your plan, you are to dissect the product, documenting the steps as you go. Post the dissection procedure and the supporting analysis to your technical report on the wiki.

Gate 3 : Product Analysis Clear assemboly.png

With the product dissected, you can now complete a detailed analysis of it. In this stage you will examine the product at the component and subsystem level, gathering detailed information. Present the information in your technical report on your wiki page.

Gate 4 : Product Explanation Assemboly 1 group 10 12.png

This is the planning stage of the project. You will be assessing the project, the product, and your group. The deliverables for this gate are the Work Proposal, Management Proposal, and the Initial Assessment. These are to be submitted in a technical report via the group’s wiki page.

Gate 5 : Delivery

In this stage you must finalize all deliverables. This includes finalizing the technical report and preparing the oral presentation. The final technical report should be published on the wiki; the oral presentation will be given at the scheduled time.

Gate 1 - Project Planning (Group 10)

Gate 2 - Product Dissection (Group 10)

Gate 3 - Product Analysis (Group 10)

Gate 4 - Product Explanation (Group 10)

Gate 5 - Delivery (Group 10)