In this section we documented all of the product’s components. In addition to an image of the component,  
+
This is the planning stage of the project. You will be assessing the project, the product, and your group. The deliverables for this gate are the Work Proposal, Management Proposal, and the Initial Assessment. These are to be submitted in a technical report via the group’s wiki page.
we also identified the component’s function, materials used, manufacturing processes used,an model. As well as the  
+
number of times the components is used.
+
 
||
 
||
 
*[[Gate 1 - Project Planning (Group 10)]]
 
*[[Gate 1 - Project Planning (Group 10)]]

Revision as of 12:29, 5 December 2012

Snow blower.jpg


Project Gates

Product Gate Number ' Product Description Link to Page
Gate 1

This is the planning stage of the project. You will be assessing the project, the product, and your group. The deliverables for this gate are the Work Proposal, Management Proposal, and the Initial Assessment. These are to be submitted in a technical report via the group’s wiki page.

Gate 2 Part 9999 group 10.png

In this section we analyze the engineering decisions that were made during the design of our product, considering the many design questions ,in Table 1 (under the table one link to the right),of a few vital components of our product.In this section we also analyse the complexity of the parts in question using our derived Complexity Scale which can be found under the Complexity Scale link to the right.

Gate 3 Clear assemboly.png

In this section our group provides solid models of 5 key components of our Snow Blower using Autodesk Inventor.

Gate 4 Assemboly 1 group 10 12.png

This is the planning stage of the project. You will be assessing the project, the product, and your group. The deliverables for this gate are the Work Proposal, Management Proposal, and the Initial Assessment. These are to be submitted in a technical report via the group’s wiki page.

Gate 5

In this stage you must finalize all deliverables. This includes finalizing the technical report and preparing the oral presentation. The final technical report should be published on the wiki; the oral presentation will be given at the scheduled time.

Gate 1 - Project Planning (Group 10)

Gate 2 - Product Dissection (Group 10)

Gate 3 - Product Analysis (Group 10)

Gate 4 - Product Explanation (Group 10)

Gate 5 - Delivery (Group 10)