Difference between revisions of "Gate1-14"

From GICL Wiki
Jump to: navigation, search
(Product Archaeology)
(Product Archaeology)
Line 54: Line 54:
  
 
= Product Archaeology =
 
= Product Archaeology =
 +
*Development Profile
 +
 +
*Usage Profile
 +
 +
*Energy Profile
 +
 +
*Complexity Profile
 +
 +
*Material Profile
 +
 +
*User Interaction Profile
 +
 +
*Product Alternative Profile

Revision as of 18:33, 5 December 2012

Packaging of the Nerf Vortex Pyragon gun

Contents

Work Proposal

We do not anticipate the dissection of the Nerf Pyragon to be a problematic procedure. The tools that we will need will be a Phillips head screwdriver, flat head screwdriver, and a rubber hammer. The Nerf gun is assembled with mostly Phillips screws so the Phillips head screwdriver will be the most needed tool we use. The flat head screwdriver will be helpful in prying apart the plastic gun and parts inside it. Also, the rubber hammer will be useful to aid in prying apart the plastic parts involved in our Nerf gun product. We predict it will take approximately three hours to dissect our product. This involves taking it apart and analyzing the parts inside of the product. We assumed about an hour for dis-assembly, an hour for analysis, and an hour to reassemble the gun. There are a few challenges we foresee in the dissection of our product.

Challenges

The clip involved with our Nerf product appears to be the greatest challenge as far as complexity. The disc ammunition is loaded through a top opening into a designated chamber. Once the chamber is full a lever mechanism is used to rotate the chambers so the next one can be filled. This is repeated four times, and as the gun fires it rotates backwards to its original position. This means there are several locking and unlocking mechanisms involved with loading and firing, which means more dis assembly, analysis, and reassembly. The pump on the end of the gun performs several operations with one quick motion. When pumped a disc is chambered to be fired, the spring is compressed, and the trigger is primed. Because of the number of duties performed by this piece of the gun, the pump will require special attention. The trigger is challenging also because it performs more than one task. It simultaneously releases the spring to fire the disc, and readies the next disc to be fired. With special attention to the magazine, pump, and trigger our group should be able to overcome the more difficult concepts of the Nerf toy.

Group Capabilities Assessment

Each member of our group has their own capabilities to benefit the dissection of our product. Regardless of capabilities, each member also has shortcomings that may affect our work. The table below demonstrates these pros and cons.

  • Ryan
    • Capabilities: Previous experience with Nerf guns, technical writing skills, work with 3D modeling
    • Shortcomings: Bad time management skills
  • Rachel
    • Capabilities: Good time management skills, leadership ability, communication skills, typing skills
    • Shortcomings: Never owned a Nerf gun
  • Peter
    • Capabilities: Previous experience with Nerf guns, had classes in physics and CAD
    • Shortcomings: Hasty
  • Brenden
    • Capabilities: Previous experience with Nerf guns, has experience with CAD
    • Shortcomings: Bad time management skills

Project Management

Management Proposal

To better manage the project we have assigned roles to each group member to lighten the work load and better organize the task. Rachel has been assigned Project Manager, due to her proficiency in leadership and time management. Peter has taken the Web Expert position, because he has previous experience with web programming. His position will require him to update the wiki when needed and handle other online research tasks. Brenden offered to take the Communication Liaison role, and will be relaying information from the group to the professors and the other way around. Ryan will be filling in the Tech Expert position, and will be revising and working on technical papers throughout the project.

  • Contact Information: Brenden Burry, Comm. Liaison: Email - Brendenb@buffalo.eduPhone - 585-409-9471

Meeting Information

Wednesdays at 5pm at group study area in the library. Sundays may be used as optional meeting times should we need more time or unseen complications arise. The following weekly schedule puts the group ahead of the current schedule, which means we can be better prepared for any emergency events that may come up during the course of the project.

Weekly Schedule

  • Week one (Oct 7 - Oct 13):

Gate 2 - Dissection/Analysis

  • Week two (Oct 14 - Oct 20):

Gate 2 - Corrective Action Review

  • Week three (Oct 21 - Oct 27):

Gate 3 -Analyze Info/Test

  • Week four (Oct 28 - Nov 3):

Gate 3 - Second Corrective Action Review

  • Week five (Nov 4 - Nov 10):

Gate 4 - Conclusions

  • Week six (Nov 11 - Nov 17):

Gate 4 - Final Corrective Action Review

  • Week seven (Nov 18 - Nov 24):

Thanksgiving

  • Week eight (Nov 25 - Dec 1):

Gate 5 - Documentation and preparation

  • Week nine (Dec 2 - Dec 8):

Gate 5 - Finalize and Submit

Product Archaeology

  • Development Profile
  • Usage Profile
  • Energy Profile
  • Complexity Profile
  • Material Profile
  • User Interaction Profile
  • Product Alternative Profile