Difference between revisions of "Delivery: Gate 5"

From GICL Wiki
Jump to: navigation, search
(Gate 1)
 
Line 11: Line 11:
 
#*Added text and discussion to product alternative profile
 
#*Added text and discussion to product alternative profile
  
==Gate 2==
+
==[[Product Dissection: Gate 2]]==
 
#Preliminary Project Review
 
#Preliminary Project Review
 
#*Stated how we will overcome future challenges
 
#*Stated how we will overcome future challenges
Line 23: Line 23:
 
#*Added labels and captions
 
#*Added labels and captions
  
==Gate 3==
+
==[[Product Analysis: Gate 3]]==
 
#Component Summary
 
#Component Summary
 
#*Added more detail to component function
 
#*Added more detail to component function
Line 51: Line 51:
 
#*Added pictures to design revisions
 
#*Added pictures to design revisions
  
==Gate 4==
+
==[[Product Explanation: Gate 4]]==
 
#Project Management
 
#Project Management
 
#*Corrective action for quality report
 
#*Corrective action for quality report

Latest revision as of 11:08, 18 December 2011

Contents

Finalization of Deliverables

Project Planning: Gate 1

  1. Work Proposal
    • Added how long each step will take
    • Added section about needed skills to be developed
  2. Management Proposal
    • Stated how many people must be present to make a decision
  3. Product Archaeology
    • Gave examples for complexity profile
    • Elaborated on user interactions
    • Added text and discussion to product alternative profile

Product Dissection: Gate 2

  1. Preliminary Project Review
    • Stated how we will overcome future challenges
  2. Product Dissection
    • Identified challenges
    • Elaborated on difficulty scale
    • Added text to subsystem documentation
    • Explained why subsystems are connected
    • Explained implementation and arrangement of subsystems
  3. Professionalism
    • Added labels and captions

Product Analysis: Gate 3

  1. Component Summary
    • Added more detail to component function
  2. Product Analysis
    • Elaborated on component function
    • Added to associated component flows
    • General shapes
    • Notable properties
    • Primary dimensions
    • Weight
    • Manufacturing decisions
    • Four factors
    • Color
    • Surface finish
    • Functional/aesthetic reasons
    • Manufacturing methods
    • Component complexity
  3. Solid Model
    • Specified CAD package
    • Added component names
    • Added assembly sequence
  4. Engineering analysis
    • Made sure units check
  5. Design revisions
    • Expanded on touch screen revision
  6. Professionalism
    • Added pictures to design revisions

Product Explanation: Gate 4

  1. Project Management
    • Corrective action for quality report
  2. Product Archeology
    • Component/sub-assembly breakdown
  3. Design Revisions
    • Addressed economic and environmental factors
    • Manufacturing/assembly
    • Cost
    • Elaborated on snap system and ink securing system
    • Tray redesign
    • Explained additional rollers

Oral Presentation

The following slides accompanied the oral presentation given during class.