Difference between revisions of "Delivery: Gate 5"

From GICL Wiki
Jump to: navigation, search
(Gate 2)
 
(11 intermediate revisions by one user not shown)
Line 1: Line 1:
 
=Finalization of Deliverables=
 
=Finalization of Deliverables=
This section lists the revisions made in each gate.
+
==[[Project Planning: Gate 1]]==
==Gate 1==
+
 
#Work Proposal
 
#Work Proposal
 
#*Added how long each step will take
 
#*Added how long each step will take
Line 12: Line 11:
 
#*Added text and discussion to product alternative profile
 
#*Added text and discussion to product alternative profile
  
==Gate 2==
+
==[[Product Dissection: Gate 2]]==
 
#Preliminary Project Review
 
#Preliminary Project Review
 
#*Stated how we will overcome future challenges
 
#*Stated how we will overcome future challenges
Line 24: Line 23:
 
#*Added labels and captions
 
#*Added labels and captions
  
==Gate 3==
+
==[[Product Analysis: Gate 3]]==
#Overall
+
#Component Summary
#*Added figure labels
+
#*Added more detail to component function
#*Improved formatting
+
#Coordination Review
+
#*Documented the effectiveness of the new time management plan
+
 
#Product Analysis
 
#Product Analysis
#*Noted that plastic is not included in the analysis of the steering column
+
#*Elaborated on component function
#*Improved difficulty scale
+
#*Added to associated component flows
 +
#*General shapes
 +
#*Notable properties
 +
#*Primary dimensions
 +
#*Weight
 +
#*Manufacturing decisions
 +
#*Four factors
 +
#*Color
 +
#*Surface finish
 +
#*Functional/aesthetic reasons
 +
#*Manufacturing methods
 +
#*Component complexity
 +
#Solid Model
 +
#*Specified CAD package
 +
#*Added component names
 +
#*Added assembly sequence
 
#Engineering analysis
 
#Engineering analysis
#*Documented how gear reduction analysis will be used in designing/testing the product
+
#*Made sure units check
 
#Design revisions
 
#Design revisions
#*Stated how the the frame will be reinforced in the design revision section
+
#*Expanded on touch screen revision
#*Added image of the rear axle revision
+
#Professionalism
 +
#*Added pictures to design revisions
  
==Gate 4==
+
==[[Product Explanation: Gate 4]]==
 +
#Project Management
 +
#*Corrective action for quality report
 
#Product Archeology
 
#Product Archeology
#*Measured the difficulty scale on better terms(i.e technical knowledge e.t.c)
+
#*Component/sub-assembly breakdown
#*Added Original assembly documentation
+
 
#Design Revisions
 
#Design Revisions
#*Addressed more societal concerns
+
#*Addressed economic and environmental factors
 +
#*Manufacturing/assembly
 +
#*Cost
 +
#*Elaborated on snap system and ink securing system
 +
#*Tray redesign
 +
#*Explained additional rollers
  
 
= Oral Presentation =
 
= Oral Presentation =
The follow images depicts the presentation used during the groups oral presentation done in class.
+
The following slides accompanied the oral presentation given during class.
<gallery perrow=6 caption="Group 16 Presentation">
+
<gallery widths=200px heights=150px perrow=6 caption="Figure 1: Group 28 Presentation">
Image:Slide1j.JPG|slide 1
+
Image:inkypres1.JPG|Slide 1
Image:Slide2G16.JPG|slide 2
+
Image:inkypres2.JPG|Slide 2
Image:Slide3G16.JPG|slide 3
+
Image:inkypres3.JPG|Slide 3
Image:Slide4G16.JPG|slide 4
+
Image:inkypres4.JPG|Slide 4
Image:Slide5G16.JPG|slide 5
+
Image:Slide6G16.JPG|slide 6
+
 
</gallery>
 
</gallery>

Latest revision as of 11:08, 18 December 2011

Contents

Finalization of Deliverables

Project Planning: Gate 1

  1. Work Proposal
    • Added how long each step will take
    • Added section about needed skills to be developed
  2. Management Proposal
    • Stated how many people must be present to make a decision
  3. Product Archaeology
    • Gave examples for complexity profile
    • Elaborated on user interactions
    • Added text and discussion to product alternative profile

Product Dissection: Gate 2

  1. Preliminary Project Review
    • Stated how we will overcome future challenges
  2. Product Dissection
    • Identified challenges
    • Elaborated on difficulty scale
    • Added text to subsystem documentation
    • Explained why subsystems are connected
    • Explained implementation and arrangement of subsystems
  3. Professionalism
    • Added labels and captions

Product Analysis: Gate 3

  1. Component Summary
    • Added more detail to component function
  2. Product Analysis
    • Elaborated on component function
    • Added to associated component flows
    • General shapes
    • Notable properties
    • Primary dimensions
    • Weight
    • Manufacturing decisions
    • Four factors
    • Color
    • Surface finish
    • Functional/aesthetic reasons
    • Manufacturing methods
    • Component complexity
  3. Solid Model
    • Specified CAD package
    • Added component names
    • Added assembly sequence
  4. Engineering analysis
    • Made sure units check
  5. Design revisions
    • Expanded on touch screen revision
  6. Professionalism
    • Added pictures to design revisions

Product Explanation: Gate 4

  1. Project Management
    • Corrective action for quality report
  2. Product Archeology
    • Component/sub-assembly breakdown
  3. Design Revisions
    • Addressed economic and environmental factors
    • Manufacturing/assembly
    • Cost
    • Elaborated on snap system and ink securing system
    • Tray redesign
    • Explained additional rollers

Oral Presentation

The following slides accompanied the oral presentation given during class.