In order to effectively manage our group and ensure completion of the project, general meeting times and locations have been determined. Each group member decided upon an individual role and must fulfill the responsibilities assigned to that role as decided by the group. Additionally, a Gantt chart was created to track our progression from start to finish throughout the project.

Group meetings will be held regularly, usually once a week, after MAE277 lecture, in room 208 of Roosevelt Hall. The meetings will either take place directly after class ends at five o’clock, or later in the evening. This will vary as schedule conflicts arise. For a broad plan of completion of the project within the time constraints, see Gantt Chart below (Figure A).


Figure A:

Figure A


This Gantt Chart outlines all the tasks necessary for completion for this project, and the timeframe for which our group plans to complete them.